Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-08940
Well Classification: GW Status: PR - 5/6/2003
Well Name/No:RANCH #14-10D (P14)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2003
FacilityID:264720LocationID:334619
County:GARFIELD #045Location:SESE 14 7S93W 6
Field:MAMM CREEK - #52500Elevation:6463 ft.
Basin:PICEANCE BASIN  
Planned Location:291FSL  398 FELLat/Long: 39.439161 / -107.734295Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.439230 / -107.734150Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/6/2003             Measured TD: 8100 ft.    Vertical TD: 7855 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/6/2003
Wellbore PermitDIRECTIONAL
Permit #:20021576 Expiration Date:8/18/2003
Proposed Top PZ Location:Sec:14 Twp: 7S 93W Footage: 1305 FSL  1310 
Bottom Hole Location:Sec:14 Twp: 7S 93W Footage: 1327 FSL  1320 FEL
Proposed Depth/Form:8700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:HUNTER MESA UNI Unit Number:COC 55279X
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: FEDERAK UN, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/5/2003
Spud Date:2/23/2003Spud Date Is:ACTUAL
Measured TD:8100 ft.Measured PB depth:
True Vertical TD:7855 ft.True Vertical PB depth:8046 ft.
Top PZ Location:Sec:14 Twp: 7S 93WFootage: 1305 FSL  1310 FL
Bottom Hole Location:Sec:14 Twp: 7S 93WFootage: 1327 FSL  1320 FEL
Log Types:CBL/GR/CCL, RST
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 846 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 846 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8100 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1235, Top: 1300 ft., Bottom: 8100 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.5188 ft.NN
WILLIAMS FORK5189 ft.8100 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 5/6/2003                  Interval Top: 6354 ft.    Interval Bottom: 7900 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/5/2003
Treatment Summary:SEE COMMENTS FOR TREATMENT
Tubing Size:2.375 in.Tubing Setting Depth:7379 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/6/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 94
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 94
CALC_BBLS_OIL 1
CALC_GOR 2339
CALC_MCF_GAS 2339
CASING_PRESS 2500
MCF_GAS 2338
TUBING_PRESS 2100
Perforation Data:
Interval Top:6354 ft.# Of Holes:94
Interval Bottom:7900 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)4127
GOR4127000
GOR DeterminationMCFE
Average BOE per Day1.952
Average MCFE per Day11.313

 Federal Financial Assurance  i Y

 Tribal Well  i No