|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/1/2024 Measured TD: 8746 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/1/2024 | | Wellbore Permit | | | Permit #: | 20031350 | Expiration Date: | 8/3/2004 | | Proposed Depth/Form: | 9000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: Wfcm , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/23/2003 | | Spud Date: | 7/13/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 8746 ft. | Measured PB depth: | 8722 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR, COMPENSATED NEUTRON, MICRO LOG, CCL, LITHODENSITY, ARRAY INDUCTION | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2422 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 2422 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8722 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 950, Top: 3950 ft., Bottom: 8722 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4357 ft. | | N | N | | FORT UNION | 4662 ft. | | N | N | | WILLIAMS FORK | 6088 ft. | | N | N | | CAMEO | 8277 ft. | | N | N | | ROLLINS | 8701 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 1/1/2024 Interval Top: 8373 ft. Interval Bottom: 8603 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | PRODUCING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/23/2003 | | Treatment Summary: | 9/23/03 B J SERVICES FRACED WITH 1367 BBL OF 20# LIGHTING HT AND 138,500# OF 20/40 AND 4000# OF 14/30 FLEX SAND MSE. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8563 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/8/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | BTU_GAS | 1006 | | CASING_PRESS | 1540 | | MCF_GAS | 362 | | TUBING_PRESS | 1520 |
| | Perforation Data: | | Interval Top: | 8373 ft. | # Of Holes: | 14 | | Interval Bottom: | 8603 ft. | Hole Size: | |
|
Formation WMFK Formation Classification: GW Status: CM - 10/8/2003 Interval Top: 6825 ft. Interval Bottom: 8195 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | PRODUCING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/23/2003 | | Treatment Summary: | 9/23/03 BJ SERVICES FRACED WITH 1772 BBL OF 20# LIGHTING HT 179,000# OF 20/40 SAND AND 6000# OF 14/30 FLEX SAND MSE. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8563 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/8/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | BTU_GAS | 1006 | | CASING_PRESS | 1540 | | MCF_GAS | 362 | | TUBING_PRESS | 1520 |
| | Perforation Data: | | Interval Top: | 6825 ft. | # Of Holes: | 20 | | Interval Bottom: | 8195 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 963 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.452 |
| Average MCFE per Day | 2.622 |
| Federal Financial Assurance | i | |
|
|