Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-08215
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:PUCKETT #218-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:264432LocationID:324201
County:GARFIELD #045Location:SWSW 25 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8318 ft.
Basin:PICEANCE BASIN  
Planned Location:417FSL  612 FWLLat/Long: 39.487908 / -108.175718Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.487908 / -108.175858Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 9303 ft.    Vertical TD: 9303 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore Permit
Permit #:20021163 Expiration Date:8/15/2003
Proposed Depth/Form:9000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMRCM , Formation: WILLIAMS FK-ROLLINS-CAMEO , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/7/2002
Spud Date:8/27/2002Spud Date Is:ACTUAL
Measured TD:9303 ft.Measured PB depth:9204 ft.
True Vertical TD:9303 ft.True Vertical PB depth:9204 ft.
Log Types:TRIPLE COMBO HRI/SDL/DSN
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 42 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 61 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2658 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 2658 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9204 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1200, Top: 5744 ft., Bottom: 9204 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2412 ft.NN
WASATCH G4328 ft.NN
FORT UNION4629 ft.NN
WILLIAMS FORK6096 ft.NN
CAMEO8297 ft.NN
ROLLINS8704 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/1/2024                  Interval Top: 8265 ft.    Interval Bottom: 8568 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/7/2002
Treatment Summary:10/7/02 BJ SERVICES FRACED W/901 BBL OF 30# MEDALLION AND 60,500# OF 20/40 AND 2000# OF 14/40 FLEX SAND.
Tubing Size:2.375 in.Tubing Setting Depth:8412 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/8/2002Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 0
BTU_GAS 1046
CASING_PRESS 550
MCF_GAS 847
TUBING_PRESS 350
Perforation Data:
Interval Top:8265 ft.# Of Holes:20
Interval Bottom:8568 ft.Hole Size:

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 4/23/2007                 Interval Top: 7261 ft.    Interval Bottom: 7997 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/7/2002
Treatment Summary:SEE SCANNED DOC # 1098602
Tubing Size:2.375 in.Tubing Setting Depth:8412 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/8/2002Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BTU_GAS 1046
CASING_PRESS 550
MCF_GAS 847
TUBING_PRESS 350
Perforation Data:
Interval Top:7261 ft.# Of Holes:18
Interval Bottom:7997 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)10052
GOR
GOR DeterminationMCFE
Average BOE per Day4.741
Average MCFE per Day27.499

 Federal Financial Assurance  i 

 Tribal Well  i No