|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2025 Measured TD: 10690 ft. Vertical TD: 10671 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2025 | | Wellbore Permit | | | Permit #: | 20021102 | Expiration Date: | 6/5/2003 | | Proposed Depth/Form: | 12000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RLNS , Formation: ROLLINS , Order: 139-8 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 10/29/2002 | | Spud Date: | 8/1/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 10690 ft. | Measured PB depth: | | | True Vertical TD: | 10671 ft. | True Vertical PB depth: | 10500 ft. | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | CBL/GR/CCL,AI/LC/GR, CN/TLD/GR(8-3-02),AI/LC/GR,CN/TLD/GR(9-2-02) | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1504 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 625, Top: 0 ft., Bottom: 1503 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10675 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 2155, Top: 5950 ft., Bottom: 10675 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 0 ft. | 7626 ft. | N | N | | WILLIAMS FORK | 7627 ft. | 10500 ft. | N | N | | ROLLINS | 10501 ft. | 10690 ft. | N | N |
Formation WMFK Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 8620 ft. Interval Bottom: 9990 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 0.375 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/29/2002 | | Treatment Summary: | SEE SCANNED DOC# 1157950 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8846 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/5/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 1 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 1825 | | CALC_MCF_GAS | 1825 | | CASING_PRESS | 2228 | | MCF_GAS | 1825 | | TUBING_PRESS | 2046 |
| | Perforation Data: | | Interval Top: | 8620 ft. | # Of Holes: | 66 | | Interval Bottom: | 9990 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 60 |
| Total Gas Produced (MCF) | 5461 |
| GOR | 91016 |
| GOR Determination | MCFE |
| Average BOE per Day | 2.726 |
| Average MCFE per Day | 15.801 |
| Federal Financial Assurance | i | |
|
|