Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-08129
Well Classification: GW Status: PR - 8/17/2004
Well Name/No:GM #22-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/17/2004
FacilityID:263455LocationID:334908
Municipality/County:PARACHUTE / GARFIELD #045Location:SENW 12 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5114 ft.
Basin:PICEANCE BASIN  
Planned Location:1833FNL  2401 FWLLat/Long: 39.454599 / -108.059495Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.454659 / -108.059710Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/17/2004             Measured TD: 6135 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/17/2004
Wellbore Permit
Permit #:20020690 Expiration Date:5/1/2003
Proposed Depth/Form:8239 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-19 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:8/8/2002
Spud Date:6/21/2002Spud Date Is:ACTUAL
Measured TD:6135 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:SPECTRAL DENSITY DUAL SPACED NEU DUAL IND., C B L
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 634 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 634 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6124 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 3000 ft., Bottom: 6124 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1304 ft.NN
FORT UNION1599 ft.NN
MESAVERDE3099 ft.NN
CAMEO COAL5619 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/17/2004                 Interval Top: 4426 ft.    Interval Bottom: 6003 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/8/2002
Treatment Summary:5707-6003' 1000 GALS 7 1/2% HCL,139200# 20/40, 3066 BBLS SLICK WATER, 5254-5583' 750 GAL 7 1/2% HCL, 154540# 20/40, 3282 BBLS SLICK WATER, 4685-4893' 750 GALS 7 1/2% HCL, 114800# 20/40, 2775 BBLS SLICK WATER, 4426-4612' 750 GALS 7 1/2% HCL, 1555000# 20/40
Tubing Size:2.375 in.Tubing Setting Depth:5697 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/17/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1050
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1100
CASING_PRESS 1410
MCF_GAS 1100
TUBING_PRESS 1805
Perforation Data:
Interval Top:4426 ft.# Of Holes:70
Interval Bottom:6003 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)11184
GOR860307
GOR DeterminationMCFE
Average BOE per Day5.318
Average MCFE per Day30.856

 Federal Financial Assurance  i 

 Tribal Well  i No