Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-08129
Well Classification: GW Status: PR - 8/17/2004
Well Name/No:GM #22-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/17/2004
FacilityID:263455LocationID:334908
Municipality/County:PARACHUTE / GARFIELD #045Location:SENW 12 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5114 ft.
Basin:PICEANCE BASIN  
Planned Location:1833FNL  2401 FWLLat/Long: 39.454599 / -108.059495Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.454659 / -108.059710Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/17/2004             Measured TD: 6135 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/17/2004
Wellbore Permit
Permit #:20020690 Expiration Date:5/1/2003
Proposed Depth/Form:8239 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-19 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:8/8/2002
Spud Date:6/21/2002Spud Date Is:ACTUAL
Measured TD:6135 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:SPECTRAL DENSITY DUAL SPACED NEU DUAL IND., C B L
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 634 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 634 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6124 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 3000 ft., Bottom: 6124 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1304 ft.NN
FORT UNION1599 ft.NN
MESAVERDE3099 ft.NN
CAMEO COAL5619 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/17/2004                 Interval Top: 4426 ft.    Interval Bottom: 6003 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/8/2002
Treatment Summary:5707-6003' 1000 GALS 7 1/2% HCL,139200# 20/40, 3066 BBLS SLICK WATER, 5254-5583' 750 GAL 7 1/2% HCL, 154540# 20/40, 3282 BBLS SLICK WATER, 4685-4893' 750 GALS 7 1/2% HCL, 114800# 20/40, 2775 BBLS SLICK WATER, 4426-4612' 750 GALS 7 1/2% HCL, 1555000# 20/40
Tubing Size:2.375 in.Tubing Setting Depth:5697 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/17/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1050
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1100
CASING_PRESS 1410
MCF_GAS 1100
TUBING_PRESS 1805
Perforation Data:
Interval Top:4426 ft.# Of Holes:70
Interval Bottom:6003 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)11098
GOR853692
GOR DeterminationMCFE
Average BOE per Day5.277
Average MCFE per Day30.622

 Federal Financial Assurance  i 

 Tribal Well  i No