Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-08126
Well Classification: GW Status: PR - 11/13/2002
Well Name/No:FEDERAL #PA 312-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62161
Facility Status:PRStatus Date11/13/2002
FacilityID:263364LocationID:335257
County:GARFIELD #045Location:SWNW 21 6S95W 6
Field:PARACHUTE - #67350Elevation:6115 ft.
Basin:PICEANCE BASIN  
Planned Location:1601FNL  1000 FWLLat/Long: 39.513198 / -108.009614Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.513237 / -108.009529Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/13/2002             Measured TD: 8383 ft.    Vertical TD: 8319 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/13/2002
Wellbore PermitDIRECTIONAL
Permit #:20020790 Expiration Date:4/22/2003
Proposed Top PZ Location:Sec:21 Twp: 6S 95W Footage: 2101 FNL  459 FWL
Bottom Hole Location:Sec:21 Twp: 6S 95W Footage: 2134 FNL  425 FWL
Proposed Depth/Form:8460 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-35 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: 45 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/6/2002
Spud Date:8/18/2002Spud Date Is:ACTUAL
Measured TD:8383 ft.Measured PB depth:8312 ft.
True Vertical TD:8319 ft.True Vertical PB depth:8248 ft.
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:THERMAL MULTIGATE DECAY LITHOLOGY LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 838 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: , Bottom: 838 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8366 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 820, Top: 4550 ft., Bottom: 8365 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH G2914 ft.NN
MESAVERDE5150 ft.NN
CAMEO7822 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/13/2002                Interval Top: 6588 ft.    Interval Bottom: 8197 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/6/2002
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7863 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/13/2002Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 0
BTU_GAS 1141
CALC_BBLS_OIL 0
CALC_MCF_GAS 1408
CASING_PRESS 1728
MCF_GAS 1408
TUBING_PRESS 1584
Perforation Data:
Interval Top:6588 ft.# Of Holes:90
Interval Bottom:8197 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)6628
GOR602545
GOR DeterminationMCFE
Average BOE per Day3.164
Average MCFE per Day18.355

 Federal Financial Assurance  i Y

 Tribal Well  i No