|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/15/2002 Measured TD: Vertical TD: 8600 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/15/2002 | | Wellbore Permit | | | Permit #: | 20020771 | Expiration Date: | 4/17/2003 | | Proposed Depth/Form: | 8800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 8/15/2002 | | Spud Date: | 5/12/2002 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | 8600 ft. | True Vertical PB depth: | 8600 ft. | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | ARRAY INDUCTION GAMMA RAY.CEMENT VOL;COMP NEUTRON LITHEDENSITY GA;MICRELEG GAMMA RAY | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1012 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1012 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 9.5 in., Size: 4.5 in., Top: 0 ft., Depth: 8600 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 763, Top: 4960 ft., Bottom: 8600 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FORT UNION | 4950 ft. | 5313 ft. | N | N | | LANCE | 5313 ft. | 6126 ft. | N | N | | MESAVERDE | 6126 ft. | 8600 ft. | N | N | | CAMEO COAL | 8600 ft. | 8650 ft. | N | N |
Formation WMFK Formation Classification: GW Status: PR - 8/15/2002 Interval Top: 7326 ft. Interval Bottom: 8469 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/15/2002 | | Treatment Summary: | FRAC MVRD ZONE1:8146-8469;' 1360BBL FLUID 147,000 LBS SAND. ZONE 2 7771-8042' 1230 BBL FLUID 135,000 LBS SAND. ZONE 3 7326-7635' 1670 BBLS FLUID 174,000 LBS SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7847 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/15/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1350 | | CASING_PRESS | 1020 | | MCF_GAS | 1350 | | TUBING_PRESS | 920 |
| | Perforation Data: | | Interval Top: | 7326 ft. | # Of Holes: | | | Interval Bottom: | 8469 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|