Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-08108
Well Classification: GW Status: PR - 9/13/2012
Well Name/No:ALP #24-9B1(J24NW)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/13/2012
FacilityID:263200LocationID:335058
County:GARFIELD #045Location:NWSE 24 6S93W 6
Field:MAMM CREEK - #52500Elevation:5677 ft.
Basin:PICEANCE BASIN  
Planned Location:2453FSL  1905 FELLat/Long: 39.511370 / -107.721565Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.511450 / -107.721810Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/13/2012             Measured TD: 8135 ft.    Vertical TD: 8032 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/13/2012
Wellbore PermitDIRECTIONAL
Permit #:20020654 Expiration Date:4/4/2003
Proposed Top PZ Location:Sec:24 Twp: 6S 93W Footage: 2313 FSL  1000 FEL
Bottom Hole Location:Sec:24 Twp: 6S 93W Footage: 2310 FSL  990 FEL
Proposed Depth/Form:8300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:GRASS MESA UNIT Unit Number:COC 56608X
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/4/2002
Spud Date:5/4/2002Spud Date Is:ACTUAL
Measured TD:8135 ft.Measured PB depth:
True Vertical TD:8032 ft.True Vertical PB depth:8096 ft.
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:CBL / GR / CCL / TEMP, PE / AI / GR, PE / TDD / CN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 869 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 869 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8135 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1290, Top: 0 ft., Bottom: 8135 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.4642 ft.NN
WILLIAMS FORK4643 ft.7605 ft.NN
ROLLINS7606 ft.8135 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  AB - 3/28/2013                 Interval Top: 6145 ft.    Interval Bottom: 7365 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/3/2002Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:3/20/2013Treatment End Date:3/20/2013
Treatment Summary:CBP SET @ 5690', TESTED TO 1500 PSI AND TOPPED WITH 2 SACKS CEMENT
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/4/2002
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 116
BBLS_OIL 55
CALC_BBLS_H2O 116
CALC_BBLS_OIL 55
CALC_GOR 23
CALC_MCF_GAS 1276
CASING_PRESS 1900
MCF_GAS 1276
TUBING_PRESS 1830
Perforation Data:
Interval Top:6145 ft.# Of Holes:52
Interval Bottom:7365 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)158
Total Gas Produced (MCF)10173
GOR64386
GOR DeterminationMCFE
Average BOE per Day5.246
Average MCFE per Day30.405

 Federal Financial Assurance  i Y

 Tribal Well  i No