Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-08021
Well Classification: GW Status: PR - 4/6/2002
Well Name/No:PA #34-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC53847
Facility Status:PRStatus Date4/6/2002
FacilityID:262387LocationID:334955
County:GARFIELD #045Location:NWSE 33 6S95W 6
Field:PARACHUTE - #67350Elevation:5162 ft.
Basin:PICEANCE BASIN  
Planned Location:1761FSL  2215 FELLat/Long: 39.478619 / -108.001663Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.478439 / -108.001584Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/6/2002             Measured TD: 6861 ft.    Vertical TD: 6798 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/6/2002
Wellbore Permit
Permit #:20020038 Expiration Date:1/10/2003
Proposed Top PZ Location:Sec:33 Twp: 6S 95W Footage: 1148 FSL  2305 FEL
Bottom Hole Location:Sec:33 Twp: 6S 95W Footage: 1070 FSL  2313 FEL
Proposed Depth/Form:6850 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-19 , Unit Acreage: 160, Drill Unit: SE/4

Wellbore Completed
Completion Date:4/4/2002
Spud Date:2/8/2002Spud Date Is:ACTUAL
Measured TD:6861 ft.Measured PB depth:6716 ft.
True Vertical TD:6798 ft.True Vertical PB depth:6653 ft.
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:THERMAL MULTAGATE DECAY LITHOLOGY
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1522 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: , Bottom: 1521 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6851 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 4400 ft., Bottom: 6850 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1277 ft.NN
FORT UNION1597 ft.NN
WILLIAMS FORK3424 ft.NN
CAMEO6224 ft.NN
ROLLINS6768 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/6/2002                  Interval Top: 4907 ft.    Interval Bottom: 6675 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/4/2002
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6480 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/6/2002Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1061
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1059
CASING_PRESS 1465
MCF_GAS 1059
TUBING_PRESS 1334
Perforation Data:
Interval Top:4907 ft.# Of Holes:86
Interval Bottom:6675 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)15
Total Gas Produced (MCF)12298
GOR819866
GOR DeterminationMCFE
Average BOE per Day5.835
Average MCFE per Day33.857

 Federal Financial Assurance  i 

 Tribal Well  i No