Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07979
Well Classification: GW Status: PR - 11/3/2005
Well Name/No:FEDERAL #10-1 (RA10)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 46032
Facility Status:PRStatus Date11/3/2005
FacilityID:261772LocationID:334738
County:GARFIELD #045Location:NENE 10 7S94W 6
Field:RULISON - #75400Elevation:6628 ft.
Basin:PICEANCE BASIN  
Planned Location:518FNL  895 FELLat/Long: 39.458750 / -107.866669Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.458890 / -107.866800Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/3/2005             Measured TD: 8660 ft.    Vertical TD: 8660 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/3/2005
Wellbore Permit
Permit #:20051359 Expiration Date:5/12/2006
Proposed Depth/Form:8632 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 139-28 , Unit Acreage: 640, Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-16/479, Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:9/4/2005
Spud Date:6/23/2005Spud Date Is:ACTUAL
Measured TD:8660 ft.Measured PB depth:8366 ft.
True Vertical TD:8660 ft.True Vertical PB depth:
Log Types:CBL, PEX
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1555 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1075, Top: 0 ft., Bottom: 1555 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8660 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1790, Top: 2220 ft., Bottom: 8660 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.5524 ft.NN
WILLIAMS FORK5525 ft.8544 ft.NN
ROLLINS8627 ft.8660 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 11/3/2005                 Interval Top: 6553 ft.    Interval Bottom: 8068 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/4/2005
Treatment Summary:STAGES 1 THROUGH 5 WERE TREATED WITH A TOTAL OF 36,956 BBLS SLICKWATER AND 794,197# OF 20-40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7557 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/3/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 120
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 120
CALC_BBLS_OIL 1
CALC_GOR 279000
CALC_MCF_GAS 1395
CASING_PRESS 1400
MCF_GAS 1395
TUBING_PRESS 1150
Perforation Data:
Interval Top:6553 ft.# Of Holes:160
Interval Bottom:8068 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)55
Total Gas Produced (MCF)22601
GOR410927
GOR DeterminationMCFE
Average BOE per Day10.815
Average MCFE per Day62.709

 Federal Financial Assurance  i Y

 Tribal Well  i No