Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07931
Well Classification: GW Status: PR - 10/1/2024
Well Name/No:PUCKETT #253-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:261237LocationID:324170
County:GARFIELD #045Location:SWNE 25 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8223 ft.
Basin:PICEANCE BASIN  
Planned Location:1320FNL  2130 FELLat/Long: 39.497568 / -108.166808Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.497625 / -108.166939Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2024             Measured TD: 8745 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2024
Wellbore Permit
Permit #:011718 Expiration Date:9/19/2002
Proposed Depth/Form:8975 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:
Casing:String Type: 1ST LINER, Hole Size: 14.75 in., Size: 19 in., Top: , Depth: 2324 ft., Weight: 2.7 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom: 2324 ft.

Wellbore Completed
Completion Date:9/10/2003
Spud Date:9/12/2002Spud Date Is:ACTUAL
Measured TD:8745 ft.Measured PB depth:8738 ft.
True Vertical TD:True Vertical PB depth:
Log Types:RESERVOIR SATURATION LOG
Log Types:GR,COMPENSATED NEUTRON, DIPOLE SONIC, CCL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2537 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 2537 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8738 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1200, Top: 4930 ft., Bottom: 8738 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4396 ft.NN
FORT UNION4662 ft.NN
WILLIAMS FORK6185 ft.NN
CAMEO8414 ft.NN
ROLLINS8681 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/1/2024                 Interval Top: 8184 ft.    Interval Bottom: 8399 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:PRODUING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/10/2003
Treatment Summary:9/10/03 BJ SERVICES FRACED WITH 2232 BBL OF 20# LIGHTING HT AND 233,000# OF 20/40 AND 6000# OF 14/30 FLEX SAND MSE. TOP:7746'/BOTTOM:8115 BJ SERVICES FRACED W/1501 BBL OF 20# LIGHTING HT 151,000# OF 20/40 SAND AND 6000# OF 14/30 FLEX SAND MSE.
Tubing Size:2.375 in.Tubing Setting Depth:8320 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/8/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1750
MCF_GAS 788
TUBING_PRESS 1700
Perforation Data:
Interval Top:8184 ft.# Of Holes:86
Interval Bottom:8399 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)18626
GOR
GOR DeterminationMCFE
Average BOE per Day8.793
Average MCFE per Day51.025

 Federal Financial Assurance  i 

 Tribal Well  i No