Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07924
Well Classification: GW Status: PR - 7/16/2009
Well Name/No:GIBSON GULCH #12-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/16/2009
FacilityID:261023LocationID:334881
County:GARFIELD #045Location:SENW 31 6S91W 6
Field:MAMM CREEK - #52500Elevation:5988 ft.
Basin:PICEANCE BASIN  
Planned Location:2380FNL  1626 FWLLat/Long: 39.484641 / -107.600101Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.484748 / -107.600134Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/16/2009             Measured TD: 5926 ft.    Vertical TD: 5611 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/16/2009
Wellbore Permit
Permit #:011552 Expiration Date:8/16/2002
Proposed Top PZ Location:Sec:31 Twp: 6S 91W Footage: 1980 FSL  660 FWL
Bottom Hole Location:Sec:31 Twp: 6S 91W Footage: 1980 FSL  660 FWL
Proposed Depth/Form:5800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:GIBSON GULCH Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/11/2001
Spud Date:8/28/2001Spud Date Is:ACTUAL
Measured TD:5926 ft.Measured PB depth:5880 ft.
True Vertical TD:5611 ft.True Vertical PB depth:5565 ft.
Top PZ Location:Sec: Twp: Footage: 1958 FSL  644 FWL
Bottom Hole Location:Sec: Twp: Footage: 1895 FSL  617 FWL
Log Types:DIL/SDL/DSN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 615 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 615 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5926 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1050, Top: 0 ft., Bottom: 5926 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3323 ft.NN
OHIO CREEK3323 ft.3796 ft.NN
WILLIAMS FORK3796 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/16/2009                 Interval Top: 4330 ft.    Interval Bottom: 5655 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:THROUGH TUBING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/11/2001
Treatment Summary:5260-5655 FRAC WITH 430,000# SAND 5076-5078 FRAC WITH 135,000# SAND, 4960-62 FRAC WITH 177,000# SAND, 4864-66 FRAC WITH FRAC WITH 80,000# SAND, 4758-60 FRAC WITH 170,000# SAND 4620-22 FRAC WITH 90,500# SAND, 4563-65 FRAC WITH 20,500# SAND, 4384-86 FRAC
Tubing Size:2.375 in.Tubing Setting Depth:5400 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/13/2001Test Method:PIPELINE
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 20
BTU_GAS 1192
CALC_BBLS_H2O 15
CALC_BBLS_OIL 20
CALC_GOR 48250
CALC_MCF_GAS 965
CASING_PRESS 1525
GRAVITY_OIL 40
MCF_GAS 965
TUBING_PRESS 1320
Perforation Data:
Interval Top:4330 ft.# Of Holes:94
Interval Bottom:5655 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)63
Total Gas Produced (MCF)11779
GOR186968
GOR DeterminationMCFE
Average BOE per Day5.735
Average MCFE per Day33.276

 Federal Financial Assurance  i 

 Tribal Well  i No