Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07909
Well Classification: GW Status: PR - 2/19/2015
Well Name/No:S.PARACHUTE FEDERAL #29-24
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/19/2015
FacilityID:260768LocationID:334983
County:GARFIELD #045Location:NENE 29 7S95W 6
Field:PARACHUTE - #67350Elevation:6189 ft.
Basin:PICEANCE BASIN  
Planned Location:1166FNL  1177 FELLat/Long: 39.412530 / -108.015393Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.412550 / -108.015790Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/19/2015             Measured TD: 7025 ft.    Vertical TD: 7025 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/19/2015
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:9/14/2004
Proposed Top PZ Location:Sec: Twp: Footage: 2062 FNL  1154 FEL
Bottom Hole Location:Sec: Twp: Footage: 1980 FNL  660 FEL
Proposed Depth/Form:6864 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/29/2004
Spud Date:2/25/2004Spud Date Is:ACTUAL
Measured TD:7025 ft.Measured PB depth:6789 ft.
True Vertical TD:7025 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2062 FNL  1154 FEL
Bottom Hole Location:Sec: Twp: Footage: 2122 FNL  1186 FEL
Log Types:RESERVOIR MONITOR,TOOL LOG, TMOLL, CBL
Log Types:RMTEL, TMDLL, CBL
Log Types:RESERVOIR MONITOR TOOL ELITE LOG, DECAY LITHO, CBL
Log Types:RESERVOIR MONITOR TOOL ELITE LOG, DECAY LITHO, CBL (SENT UNDER SEPARATE COVER PREVIOUSLY)
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1517 ft., Weight: 70.9 , Citings Type: ACTUAL
Cement:Sacks: 465, Top: 0 ft., Bottom: 1135 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7003 ft., Weight: 37.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 1900 ft., Bottom: 7003 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WARSAW-OSAGE-ST JOE-ABCK0 ft.4027 ft.NN
WASATCH0 ft.4028 ft.NN
WILLIAMS FORK4028 ft.6916 ft.NN
ROLLINS6916 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 2/19/2015                 Interval Top: 5104 ft.    Interval Bottom: 6582 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:5/5/2004Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/12/2013Treatment End Date:8/12/2013
Treatment Summary:CBP SET AT 5023' AND TOPPED WITH 2 SACKS CEMENT
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/29/2004
Treatment Summary:STAGE 1; PERFED 6429-6582', FRACED DN 5.5" CSG VIA DS SLICK WATER,55,943# 20/40 SAND.1324 BF. STAGE 2; PERFED 6123-6273', FRACED DN 5.5" CSG VIA DS SLICK WATER, 80,098# 20/40 SAND. 1557 BF. STAGE 3; PERFED 5844-5970'. FRACED DN 5.5" CSG VIA DS SLICK WATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 150
BBLS_OIL 0
CALC_BBLS_H2O 150
CALC_BBLS_OIL 0
CALC_MCF_GAS 862
CASING_PRESS 950
MCF_GAS 862
TUBING_PRESS 740
Perforation Data:
Interval Top:5104 ft.# Of Holes:150
Interval Bottom:6582 ft.Hole Size:3.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)34
Total Gas Produced (MCF)10840
GOR318823
GOR DeterminationMCFE
Average BOE per Day5.212
Average MCFE per Day30.229

 Federal Financial Assurance  i Y

 Tribal Well  i No