Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07880
Well Classification: OW Status: PR - 6/20/2002
Well Name/No:UNOCAL #GM 543-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/20/2002
FacilityID:260617LocationID:335250
County:GARFIELD #045Location:SESE 33 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5409 ft.
Basin:PICEANCE BASIN  
Planned Location:1286FSL  902 FELLat/Long: 39.476688 / -108.107126Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.476817 / -108.107013Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/20/2002             Measured TD: 6382 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/20/2002
Wellbore Permit
Permit #:011349 Expiration Date:7/11/2002
Proposed Top PZ Location:Sec:33 Twp: 6S 96W Footage: 1634 FSL  1167 FEL
Bottom Hole Location:Sec:33 Twp: 6S 96W Footage: 1666 FSL  1203 FEL
Proposed Depth/Form:6350 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:6/11/2002
Spud Date:11/24/2001Spud Date Is:ACTUAL
Measured TD:6382 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1665 FSL  1223 FEL
Bottom Hole Location:Sec: Twp: Footage: 1663 FSL  1254 FEL
Log Types:DUAL IND SPECTRAL DEN DUAL SPACED NEU, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 634 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: , Bottom: 634 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6371 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: , Bottom: 6371 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1673 ft.NN
FORT HAYS1997 ft.NN
MESAVERDE3312 ft.NN
CAMEO5845 ft.NN
ROLLINS6346 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 6/20/2002                 Interval Top: 4610 ft.    Interval Bottom: 6061 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/11/2002
Treatment Summary:750 GALS 7 1/2% HCL, 54600# 20/40, 1743 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:5761 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/20/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1209
CASING_PRESS 1453
TUBING_PRESS 1340
Perforation Data:
Interval Top:4610 ft.# Of Holes:64
Interval Bottom:6061 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)7181
GOR652818
GOR DeterminationMCFE
Average BOE per Day3.420
Average MCFE per Day19.843

 Federal Financial Assurance  i 

 Tribal Well  i No