Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07874
Well Classification: GW Status: PR - 6/9/2001
Well Name/No:CLOUGH #RWF 433-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/9/2001
FacilityID:260583LocationID:335236
County:GARFIELD #045Location:NWSE 20 6S94W 6
Field:RULISON - #75400Elevation:5382 ft.
Basin:PICEANCE BASIN  
Planned Location:2090FSL  1857 FELLat/Long: 39.509059 / -107.909351Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.509162 / -107.909387Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/9/2001             Measured TD: 7744 ft.    Vertical TD: 7714 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/9/2001
Wellbore Permit
Permit #:011343 Expiration Date:7/9/2002
Proposed Top PZ Location:Sec:20 Twp: 6S 94W Footage: 2370 FSL  2232 FEL
Bottom Hole Location:Sec:20 Twp: 6S 94W Footage: 2410 FSL  2313 FEL
Proposed Depth/Form:7860 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-36 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:2/23/2002
Spud Date:9/20/2001Spud Date Is:ACTUAL
Measured TD:7744 ft.Measured PB depth:7648 ft.
True Vertical TD:7714 ft.True Vertical PB depth:7618 ft.
Top PZ Location:Sec: Twp: Footage: 2356 FSL  2243 FEL
Bottom Hole Location:Sec: Twp: Footage: 2390 FSL  2329 FEL
Log Types:DUAL INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON
Log Types:DIL-GR-SP & NEUTRON DENSITY, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1111 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: , Bottom: 1110 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7733 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: 3480 ft., Bottom: 7733 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1830 ft.NN
MESAVERDE4245 ft.NN
WILLIAMS FORK4245 ft.NN
CAMEO6904 ft.NN
CAMEO COAL6904 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/9/2001                  Interval Top: 5443 ft.    Interval Bottom: 7560 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/23/2002
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7262 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/24/2002Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1105
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1869
CASING_PRESS 2204
MCF_GAS 1869
TUBING_PRESS 2137
Perforation Data:
Interval Top:5443 ft.# Of Holes:102
Interval Bottom:7560 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)37
Total Gas Produced (MCF)16537
GOR446945
GOR DeterminationMCFE
Average BOE per Day7.922
Average MCFE per Day45.932

 Federal Financial Assurance  i 

 Tribal Well  i No