|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2024 Measured TD: 7645 ft. Vertical TD: 7573 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2024 | | Wellbore Permit | | | Permit #: | 011217 | Expiration Date: | 6/21/2002 | | Proposed Top PZ Location: | Sec:31 Twp: 6S 95W | Footage: 1296 FNL 1944 FWL | | Bottom Hole Location: | Sec:31 Twp: 6S 95W | Footage: 1365 FNL 1965 FWL | | Proposed Depth/Form: | 7570 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 479-8 , Unit Acreage: 320, Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: 45 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 2/16/2002 | | Spud Date: | 11/20/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 7645 ft. | Measured PB depth: | 7565 ft. | | True Vertical TD: | 7573 ft. | True Vertical PB depth: | 7493 ft. | | Log Types: | THERMAL DECAY MULTIGATE LITHOLOGY | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 842 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: , Bottom: 842 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7598 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 4230 ft., Bottom: 7597 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | UNKNOWN | 2266 ft. | | N | N | | FORT UNION | 2716 ft. | | N | N | | MESAVERDE | 4507 ft. | | N | N | | CAMEO | 7105 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 10/1/2024 Interval Top: 6084 ft. Interval Bottom: 7411 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 2/17/2002 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/16/2002 | | Treatment Summary: | SEE SCANNED DOC. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7185 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/17/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| MCF_GAS | 1650 |
| | Perforation Data: | | Interval Top: | 6084 ft. | # Of Holes: | 62 | | Interval Bottom: | 7411 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 15 |
| Total Gas Produced (MCF) | 11363 |
| GOR | 757533 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.414 |
| Average MCFE per Day | 31.396 |
| Federal Financial Assurance | i | Y |
|
|