Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07852
Well Classification: GW Status: PR - 6/11/2002
Well Name/No:FEDERAL #GM 13-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC58167
Facility Status:PRStatus Date6/11/2002
FacilityID:260421LocationID:335097
County:GARFIELD #045Location:SWSW 25 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5984 ft.
Basin:PICEANCE BASIN  
Planned Location:718FSL  795 FWLLat/Long: 39.488598 / -108.063985Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.488843 / -108.064480Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/11/2002             Measured TD: 7476 ft.    Vertical TD: 7407 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/11/2002
Wellbore Permit
Permit #:011170 Expiration Date:6/18/2002
Proposed Top PZ Location:Sec:25 Twp: 6S 96W Footage: 1452 FSL  518 FWL
Bottom Hole Location:Sec:25 Twp: 6S 96W Footage: 1512 FSL  460 FWL
Proposed Depth/Form:7340 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 479-8 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: , Weight: 45 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/15/2002
Spud Date:3/21/2002Spud Date Is:ACTUAL
Measured TD:7476 ft.Measured PB depth:7414 ft.
True Vertical TD:7407 ft.True Vertical PB depth:7345 ft.
Top PZ Location:Sec: Twp: Footage: 1497 FSL  515 FWL
Bottom Hole Location:Sec: Twp: Footage: 1483 FSL  473 FWL
Log Types:THERMAL MULTIGATE DECAY LITHOLOGY & CBL
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 921 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 921 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7460 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 3200 ft., Bottom: 7460 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2383 ft.NN
FORT UNION2780 ft.NN
MESAVERDE4366 ft.NN
CAMEO6963 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/11/2002                 Interval Top: 5855 ft.    Interval Bottom: 7328 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/11/2002Choke Size:2.333 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:Yes
Formation Treatment
Treatment Date:6/15/2002
Treatment Summary:3250 GALS 7.5 hcl: 498,125 20/40 SAND & 11,262 BBLS SLICK WATER
Tubing Size:2.375 in.Tubing Setting Depth:7024 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/17/2002Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1077
CALC_MCF_GAS 1442
CASING_PRESS 2306
MCF_GAS 1442
TUBING_PRESS 0
Perforation Data:
Interval Top:5855 ft.# Of Holes:68
Interval Bottom:7328 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)21
Total Gas Produced (MCF)10725
GOR510714
GOR DeterminationMCFE
Average BOE per Day5.127
Average MCFE per Day29.727

 Federal Financial Assurance  i Y

 Tribal Well  i No