Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07834
Well Classification: GW Status: PR - 5/25/2001
Well Name/No:FEDERAL #PA 14-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62162
Facility Status:PRStatus Date5/25/2001
FacilityID:260221LocationID:335238
County:GARFIELD #045Location:SESW 29 6S95W 6
Field:PARACHUTE - #67350Elevation:5674 ft.
Basin:PICEANCE BASIN  
Planned Location:626FSL  2220 FWLLat/Long: 39.489989 / -108.023294Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.489971 / -108.023229Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/14/2001             Measured TD: 7504 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/14/2001
Wellbore Permit
Permit #:011038 Expiration Date:5/24/2002
Proposed Top PZ Location:Sec:29 Twp: 6S 95W Footage: 446 FSL  882 FWL
Bottom Hole Location:Sec:29 Twp: 6S 95W Footage: 455 FSL  1308 FWL
Proposed Depth/Form:7300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: 45 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:N/A
Spud Date:8/18/2001Spud Date Is:ACTUAL
Measured TD:7504 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:THERMAL DECAY MULTIGATE LITHOLOGY
Log Types:THERMAL MULIGATE DECAY LITHOLOGY AND CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1038 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: , Bottom: 1038 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7312 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 965, Top: 1940 ft., Bottom: 7312 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH G1888 ft.NN
FORT UNION2188 ft.NN
MESAVERDE3968 ft.NN
CAMEO COAL6738 ft.NN
CAMEO6799 ft.NN
ROLLINS7278 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2012                  Interval Top: 5672 ft.    Interval Bottom: 7108 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/18/2001
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6851 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/18/2001Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1078
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1399
CASING_PRESS 1689
MCF_GAS 1399
TUBING_PRESS 1549
Perforation Data:
Interval Top:5672 ft.# Of Holes:82
Interval Bottom:7108 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)7807
GOR709727
GOR DeterminationMCFE
Average BOE per Day3.721
Average MCFE per Day21.576

 Federal Financial Assurance  i Y

 Tribal Well  i No