|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/20/2005 Measured TD: 7775 ft. Vertical TD: 7713 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/20/2005 | | Wellbore Permit | | | Permit #: | 010822 | Expiration Date: | 4/29/2002 | | Proposed Top PZ Location: | Sec:2 Twp: 7S 93W | Footage: 1339 FSL 2616 FWL | | Bottom Hole Location: | Sec:2 Twp: 7S 93W | Footage: 1339 FSL 2616 FWL | | Proposed Depth/Form: | 7680 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 10/28/2001 | | Spud Date: | 10/13/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 7775 ft. | Measured PB depth: | 7716 ft. | | True Vertical TD: | 7713 ft. | True Vertical PB depth: | 7654 ft. | | Top PZ Location: | Sec: Twp: | Footage: 1653 FNL 2487 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 1693 FNL 2524 FWL | | Log Types: | DUAL INDUCTION, NEUTRON DENITY. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 828 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 828 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7762 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1100, Top: , Bottom: 7762 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 4150 ft. | 7140 ft. | N | N | | CAMEO COAL | 7142 ft. | 7767 ft. | N | N |
Formation WMFK Formation Classification: GW Status: PR - 1/20/2005 Interval Top: 6138 ft. Interval Bottom: 6325 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 1/20/2005 | Choke Size: | 18.000 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/12/2005 | | Treatment Summary: | STAGE 5R WAS TERATED WITH A TOTAL OF 4256 BBLS OF SLICKWATER & 204,000# 20/40 SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6960 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/20/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 4 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 54965 | | CALC_MCF_GAS | 238 | | CASING_PRESS | 273 | | MCF_GAS | 238 |
| | Perforation Data: | | Interval Top: | 6138 ft. | # Of Holes: | 20 | | Interval Bottom: | 6325 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 62 |
| Total Gas Produced (MCF) | 34602 |
| GOR | 558096 |
| GOR Determination | MCFE |
| Average BOE per Day | 16.506 |
| Average MCFE per Day | 95.719 |
| Federal Financial Assurance | i | Y |
|
|