Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07792
Well Classification: GW Status: SI - 8/1/2025
Well Name/No:COUEY #17-5B (E17E)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2025
FacilityID:259882LocationID:334898
County:GARFIELD #045Location:SWNW 17 7S92W 6
Field:MAMM CREEK - #52500Elevation:6045 ft.
Basin:PICEANCE BASIN  
Planned Location:1899FNL  517 FWLLat/Long: 39.448391 / -107.697574Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.448460 / -107.697350Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 8/1/2025             Measured TD: 6259 ft.    Vertical TD: 6113 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 8/1/2025
Wellbore Permit
Permit #:010763 Expiration Date:4/23/2002
Proposed Top PZ Location:Sec:17 Twp: 7S 92W Footage: 2627 FNL  1317 FWL
Bottom Hole Location:Sec:17 Twp: 7S 92W Footage: 2627 FNL  1317 FWL
Proposed Depth/Form:6110 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/15/2001
Spud Date:9/27/2001Spud Date Is:ACTUAL
Measured TD:6259 ft.Measured PB depth:6214 ft.
True Vertical TD:6113 ft.True Vertical PB depth:6068 ft.
Top PZ Location:Sec: Twp: Footage: 2585 FNL  1221 FWL
Bottom Hole Location:Sec: Twp: Footage: 2492 FSL  1169 FWL
Log Types:DUAL INDUCTION, NEUTRON DENSITY
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1275 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 1275 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6258 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1390, Top: 0 ft., Bottom: 6258 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK2840 ft.5884 ft.NN
COAL5884 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 8/1/2025                  Interval Top: 4433 ft.    Interval Bottom: 6172 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/15/2001
Treatment Summary:STAGE 01 R; 4,433-4767, 18-0.360" SHOTS, 2565 BBLS OF # DELTA FRAC, 140100 LBS OF 20-40 SAND STAGE 01 R; 4433-47467. 18-0.360" SHOTS. 2550 BBLS OF SLICKWATER, 138000 LBS OF 20-40 SAND STAGE 1A; 6,074-6172 6-0.430" SHOTS,995 BBLS OF DELTA FRAC, 102200 LBS
Tubing Size:2.375 in.Tubing Setting Depth:6132 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/7/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 1
BTU_GAS 1170
CALC_BBLS_H2O 7
CALC_BBLS_OIL 1
CALC_GOR 236
CALC_MCF_GAS 236
CASING_PRESS 200
MCF_GAS 236
TUBING_PRESS 820
Perforation Data:
Interval Top:4433 ft.# Of Holes:78
Interval Bottom:6172 ft.Hole Size:0.43 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)31
GOR
GOR DeterminationMCFE
Average BOE per Day0.016
Average MCFE per Day0.084

 Federal Financial Assurance  i Y

 Tribal Well  i No