Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07759
Well Classification: GW Status: PR - 1/1/2024
Well Name/No:PUCKETT #21-31D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2024
FacilityID:259589LocationID:335297
County:GARFIELD #045Location:SENW 31 6S96W 6
Field:GRAND VALLEY - #31290Elevation:6510 ft.
Basin:PICEANCE BASIN  
Planned Location:3007FSL  2281 FWLLat/Long: 39.481378 / -108.151138Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.481420 / -108.151140Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2024             Measured TD: 7538 ft.    Vertical TD: 7311 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2024
Wellbore Permit
Permit #:010531 Expiration Date:3/20/2002
Proposed Top PZ Location:Sec:31 Twp: 6S 96W Footage: 2080 FWL  4493 FSL
Proposed Depth/Form:7700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CMEO , Formation: CAMEO , Order: 510-1 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/16/2001
Spud Date:3/31/2001Spud Date Is:ACTUAL
Measured TD:7538 ft.Measured PB depth:7459 ft.
True Vertical TD:7311 ft.True Vertical PB depth:7268 ft.
Top PZ Location:Sec: Twp: Footage: 4415 FSL  2100 FWL
Bottom Hole Location:Sec: Twp: Footage: 4553 FSL  2076 FWL
Log Types:SONIC, GR, NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 61 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 61 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 3082 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 1025, Top: 0 ft., Bottom: 3082 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7459 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 4581 ft., Bottom: 7459 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION3108 ft.NN
WILLIAMS FORK4548 ft.NN
CAMEO6936 ft.NN
ROLLINS7404 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2024                  Interval Top: 5332 ft.    Interval Bottom: 7153 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.344 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:PRODUCING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/16/2001
Treatment Summary:9/06/01 B J SERVICES FRACED WITH 2055 BBL OF 16# VISTAR AND 177000# OF 20/40 AND 8000 # OF 14/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7109 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/2001Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
CALC_BBLS_H2O 15
CALC_MCF_GAS 1966
CASING_PRESS 80
MCF_GAS 1966
Perforation Data:
Interval Top:5332 ft.# Of Holes:10
Interval Bottom:7153 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)11440
GOR
GOR DeterminationMCFE
Average BOE per Day5.395
Average MCFE per Day31.314

 Federal Financial Assurance  i 

 Tribal Well  i No