|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/10/2026 Measured TD: 7800 ft. Vertical TD: 7712 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/10/2026 | | Wellbore Permit | | | Permit #: | 010519 | Expiration Date: | 3/19/2002 | | Proposed Top PZ Location: | Sec:5 Twp: 6S 96W | Footage: 660 FEL 660 FSL | | Bottom Hole Location: | Sec: Twp: | Footage: 650 FSL 227 FWL | | Proposed Depth/Form: | 8100 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CMEO , Formation: CAMEO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 17.25 in., Size: 16 in., Top: , Depth: 40 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 40 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/5/2001 | | Spud Date: | 8/29/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 7800 ft. | Measured PB depth: | 7782 ft. | | True Vertical TD: | 7712 ft. | True Vertical PB depth: | 7696 ft. | | Top PZ Location: | Sec: Twp: | Footage: 727 FSL 705 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 647 FSL 643 FEL | | Log Types: | NEU, DPS, GR, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 61 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 61 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2796 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 980, Top: 0 ft., Bottom: 2796 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7782 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 5052 ft., Bottom: 7782 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FORT UNION | 2766 ft. | | N | N | | WILLIAMS FORK | 4345 ft. | | N | N | | CAMEO | 7110 ft. | | N | N | | ROLLINS | 7700 ft. | | N | N |
Formation CMEO Formation Classification: GW Status: PR - 3/10/2026 Interval Top: 7188 ft. Interval Bottom: 7469 ft.| Completed Information for Formation CAMEO | | 1st Production Date: | 12/1/2001 | Choke Size: | | | Formation Name: | CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7314 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEO. |
| | Perforation Data: | | Interval Top: | 7188 ft. | # Of Holes: | 48 | | Interval Bottom: | 7469 ft. | Hole Size: | 0.34 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 3/1/2019 Interval Top: 5200 ft. Interval Bottom: 7496 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | PRODUCING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/5/2001 | | Treatment Summary: | 10/5/2001 B J SERVICES FRACED WITH 2112 BBL OF 25# VISTAR AND 8000 # OF 14/40 FLEX SAND 189500# OF 20/40 SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7314 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/6/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | CASING_PRESS | 1400 | | MCF_GAS | 1260 |
| | Perforation Data: | | Interval Top: | 5200 ft. | # Of Holes: | 62 | | Interval Bottom: | 7496 ft. | Hole Size: | |
|
Formation WMFK Formation Classification: GW Status: PR - 3/10/2026 Interval Top: 5200 ft. Interval Bottom: 7037 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 12/1/2001 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7314 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | Perforation Data: | | Interval Top: | 5200 ft. | # Of Holes: | 14 | | Interval Bottom: | 7037 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 92 |
| Total Gas Produced (MCF) | 13280 |
| GOR | 144347 |
| GOR Determination | MCFE |
| Average BOE per Day | 6.525 |
| Average MCFE per Day | 37.840 |
| Federal Financial Assurance | i | |
|
|