Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07755
Well Classification: GW Status: PR - 3/10/2026
Well Name/No:CHEVRON #44-5D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/10/2026
FacilityID:259577LocationID:335766
County:GARFIELD #045Location:SWSW 4 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5701 ft.
Basin:PICEANCE BASIN  
Planned Location:650FSL  227 FWLLat/Long: 39.548477 / -108.120447Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.548500 / -108.120330Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/10/2026             Measured TD: 7800 ft.    Vertical TD: 7712 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/10/2026
Wellbore Permit
Permit #:010519 Expiration Date:3/19/2002
Proposed Top PZ Location:Sec:5 Twp: 6S 96W Footage: 660 FEL  660 FSL
Bottom Hole Location:Sec: Twp: Footage: 650 FSL  227 FWL
Proposed Depth/Form:8100 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CMEO , Formation: CAMEO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 17.25 in., Size: 16 in., Top: , Depth: 40 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 40 ft.

Wellbore Completed
Completion Date:10/5/2001
Spud Date:8/29/2001Spud Date Is:ACTUAL
Measured TD:7800 ft.Measured PB depth:7782 ft.
True Vertical TD:7712 ft.True Vertical PB depth:7696 ft.
Top PZ Location:Sec: Twp: Footage: 727 FSL  705 FEL
Bottom Hole Location:Sec: Twp: Footage: 647 FSL  643 FEL
Log Types:NEU, DPS, GR, CBL
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 61 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 61 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2796 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 980, Top: 0 ft., Bottom: 2796 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7782 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 5052 ft., Bottom: 7782 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION2766 ft.NN
WILLIAMS FORK4345 ft.NN
CAMEO7110 ft.NN
ROLLINS7700 ft.NN

Formation CMEO                     Formation Classification:  GW                     Status:  PR - 3/10/2026                 Interval Top: 7188 ft.    Interval Bottom: 7469 ft.

 Completed Information for Formation CAMEO
1st Production Date:12/1/2001Choke Size: 
Formation Name:CAMEOCommingled:
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7314 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CMEO.
Perforation Data:
Interval Top:7188 ft.# Of Holes:48
Interval Bottom:7469 ft.Hole Size:0.34 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/1/2019                  Interval Top: 5200 ft.    Interval Bottom: 7496 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:PRODUCING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/5/2001
Treatment Summary:10/5/2001 B J SERVICES FRACED WITH 2112 BBL OF 25# VISTAR AND 8000 # OF 14/40 FLEX SAND 189500# OF 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7314 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/6/2001Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1400
MCF_GAS 1260
Perforation Data:
Interval Top:5200 ft.# Of Holes:62
Interval Bottom:7496 ft.Hole Size:

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 3/10/2026                 Interval Top: 5200 ft.    Interval Bottom: 7037 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:12/1/2001Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7314 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:5200 ft.# Of Holes:14
Interval Bottom:7037 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)92
Total Gas Produced (MCF)13280
GOR144347
GOR DeterminationMCFE
Average BOE per Day6.525
Average MCFE per Day37.840

 Federal Financial Assurance  i 

 Tribal Well  i No