|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2024 Measured TD: 6205 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2024 | | Wellbore Permit | | | Permit #: | 010466 | Expiration Date: | 3/11/2002 | | Proposed Depth/Form: | 6100 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 139-31 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 5/17/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 6205 ft. | Measured PB depth: | 6153 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL, CNL, GR, DSI, FMI, CMR, SIDWALL CORE LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1116 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 1116 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6205 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 300 ft., Bottom: 6205 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 0 ft. | 2312 ft. | N | N | | OHIO CREEK | 3247 ft. | 3397 ft. | N | N | | WILLIAMS FORK | 3397 ft. | 5684 ft. | Y | N | | CAMEO | 5684 ft. | 6129 ft. | N | N | | ILES | 6129 ft. | 7853 ft. | N | N |
Formation WFCMC Formation Classification: GW Status: CM - 10/16/2003 Interval Top: 4676 ft. Interval Bottom: 6102 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO COAL | | 1st Production Date: | N/A | Choke Size: | 2.313 in. | | Formation Name: | WILLIAMS FORK-CAMEO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/28/2001 | | Treatment Summary: | 1000 GALS 7-1/2% HCI; 32,220 GALS 100,# 20/40 SD; 160,961 GALS, 358,000 # 20/40 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5513 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/28/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 0 | | BTU_GAS | 400 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 597 | | CASING_PRESS | 1120 | | MCF_GAS | 597 | | TUBING_PRESS | 840 |
| | Perforation Data: | | Interval Top: | 4676 ft. | # Of Holes: | 100 | | Interval Bottom: | 6102 ft. | Hole Size: | 3 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 2/1/2024| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | No Perforation Data was found for formation WFCM. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1 |
| Total Gas Produced (MCF) | 7259 |
| GOR | 7259000 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.432 |
| Average MCFE per Day | 19.914 |
| Federal Financial Assurance | i | Y |
|
|