Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07728
Well Classification: GW Status: PR - 10/16/2003
Well Name/No:SAVAGE #2-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/16/2003
FacilityID:259442LocationID:334639
County:GARFIELD #045Location:SWNW 1 7S94W 6
Field:RULISON - #75400Elevation:6288 ft.
Basin:PICEANCE BASIN  
Planned Location:1603FNL  591 FWLLat/Long: 39.470180 / -107.843588Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.470250 / -107.843740Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/16/2003             Measured TD: 8089 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/16/2003
Wellbore Permit
Permit #:010423 Expiration Date:3/4/2002
Proposed Top PZ Location:Sec:2 Twp: 7S 94W Footage: 647 FNL  665 FEL
Bottom Hole Location:Sec:2 Twp: 7S 94W Footage: 647 FNL  665 FEL
Proposed Depth/Form:7800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 139-28 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:9/18/2001
Spud Date:6/12/2001Spud Date Is:ACTUAL
Measured TD:8089 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 701 FNL  271 FEL
Bottom Hole Location:Sec: Twp: Footage: 620 FNL  742 FEL
Log Types:GR/DIL/DEN/NEUT/SON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1561 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 1561 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8073 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 8089 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH A0 ft.2247 ft.NN
WASATCH G2247 ft.4717 ft.NN
OHIO CREEK4717 ft.4841 ft.NN
WILLIAMS FORK4841 ft.7576 ft.NN
CAMEO7576 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/16/2003                Interval Top: 5838 ft.    Interval Bottom: 7514 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/18/2001
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7617 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/26/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 0
BTU_GAS 1500
CALC_BBLS_H2O 10
CALC_BBLS_OIL 0
CALC_MCF_GAS 1360
CASING_PRESS 1800
MCF_GAS 1360
TUBING_PRESS 1800
Perforation Data:
Interval Top:5838 ft.# Of Holes:224
Interval Bottom:7514 ft.Hole Size:3 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)34
Total Gas Produced (MCF)12022
GOR353588
GOR DeterminationMCFE
Average BOE per Day5.767
Average MCFE per Day33.458

 Federal Financial Assurance  i Y

 Tribal Well  i No