Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07727
Well Classification: GW Status: PR - 9/1/2004
Well Name/No:JACKSON #9-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2004
FacilityID:259438LocationID:335347
County:GARFIELD #045Location:NWSE 28 6S92W 6
Field:MAMM CREEK - #52500Elevation:5792 ft.
Basin:PICEANCE BASIN  
Planned Location:1985FSL  1960 FELLat/Long: 39.496121 / -107.669193Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.496194 / -107.669042Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2004             Measured TD: 6670 ft.    Vertical TD: 6448 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2004
Wellbore Permit
Permit #:010418 Expiration Date:3/4/2002
Proposed Depth/Form:6500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/13/2001
Spud Date:5/1/2001Spud Date Is:ACTUAL
Measured TD:6670 ft.Measured PB depth:6632 ft.
True Vertical TD:6448 ft.True Vertical PB depth:6410 ft.
Top PZ Location:Sec: Twp: Footage: 1978 FSL  670 FEL
Bottom Hole Location:Sec: Twp: Footage: 1940 FSL  615 FEL
Log Types:DIL/SDL/DSN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 660 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 660 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6670 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1070, Top: 0 ft., Bottom: 6670 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3390 ft.NN
OHIO CREEK3942 ft.5130 ft.NN
WILLIAMS FORK3942 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 9/1/2004                  Interval Top: 5300 ft.    Interval Bottom: 6250 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:THROUGH TUBING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/13/2001
Treatment Summary:5300-5419 FRACED W/370000# 20/40 SAND PLUS 2946 BBL 2% KCL WATER. 5517-5787 FRACED W/299700# 20/40 SAND PLUS 2690 BBL 2% KCL WATER. 5908-6250 FRACED W/170000# 20/40 SAND PLUS 1547 BBL 2% KCL WATER.
Tubing Size:2.375 in.Tubing Setting Depth:6103 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/20/2001Test Method:
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 71
BTU_GAS 1170
CALC_BBLS_H2O 2
CALC_BBLS_OIL 71
CALC_GOR 10197
CALC_MCF_GAS 704
CASING_PRESS 1075
GRAVITY_OIL 40
MCF_GAS 724
TUBING_PRESS 820
Perforation Data:
Interval Top:5300 ft.# Of Holes:52
Interval Bottom:6250 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
11/2024 - 10/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)4
Total Gas Produced (MCF)2569
GOR642250
GOR DeterminationMCFE
Average BOE per Day1.225
Average MCFE per Day7.109

 Federal Financial Assurance  i 

 Tribal Well  i No