Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07713
Well Classification: GW Status: PR - 2/19/2001
Well Name/No:UNOCAL #GM 14-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC49009
Facility Status:PRStatus Date2/19/2001
FacilityID:259331LocationID:335306
County:GARFIELD #045Location:SWSW 27 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5614 ft.
Basin:PICEANCE BASIN  
Planned Location:158FSL  1120 FWLLat/Long: 39.488178 / -108.100126Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.488355 / -108.100080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/25/2001             Measured TD: 6836 ft.    Vertical TD: 6833 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/25/2001
Wellbore Permit
Permit #:010311 Expiration Date:2/18/2002
Proposed Top PZ Location:Sec:27 Twp: 6S 96W Footage: 271 FSL  1071 FWL
Bottom Hole Location:Sec:27 Twp: 6S 96W Footage: 300 FSL  1054 FWL
Proposed Depth/Form:6813 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-6 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:6/1/2001
Spud Date:3/17/2001Spud Date Is:ACTUAL
Measured TD:6836 ft.Measured PB depth:6758 ft.
True Vertical TD:6833 ft.True Vertical PB depth:6755 ft.
Top PZ Location:Sec: Twp: Footage: 252 FSL  1041 FWL
Bottom Hole Location:Sec: Twp: Footage: 211 FSL  1041 FWL
Log Types:THERMAL DECAY, CBL
Log Types:THERMAL MULTIGATE DECAY LITHOLOGY WITH CMT BONG LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 304 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 0 ft., Bottom: 304 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6825 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: 3600 ft., Bottom: 6825 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2022 ft.NN
FORT HAYS2277 ft.NN
FORT UNION2277 ft.NN
MESAVERDE3745 ft.NN
CAMEO COAL6366 ft.NN
ROLLINS6779 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/25/2001                 Interval Top: 5140 ft.    Interval Bottom: 6658 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/1/2001
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6175 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/3/2001Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1686
CASING_PRESS 1987
MCF_GAS 1686
TUBING_PRESS 1908
Perforation Data:
Interval Top:5140 ft.# Of Holes:68
Interval Bottom:6658 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9628
GOR802333
GOR DeterminationMCFE
Average BOE per Day4.577
Average MCFE per Day26.583

 Federal Financial Assurance  i 

 Tribal Well  i No