|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2004 Measured TD: 5395 ft. Vertical TD: 5395 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2004 | | Wellbore Permit | | | Permit #: | 010221 | Expiration Date: | 2/6/2002 | | Proposed Depth/Form: | 5400 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 191-5 , Unit Acreage: 40, Drill Unit: NENE |
| | |
| Wellbore Completed | | Completion Date: | 3/20/2001 | | Spud Date: | 3/8/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 5395 ft. | Measured PB depth: | 5376 ft. | | True Vertical TD: | 5395 ft. | True Vertical PB depth: | 5376 ft. | | Log Types: | DIL/SDL/DSN, CBL-GR-CCL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 620 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 620 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5394 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1100, Top: 235 ft., Bottom: 5394 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 0 ft. | 3068 ft. | N | N | | OHIO CREEK | 3068 ft. | 3661 ft. | N | N | | WILLIAMS FORK | 3661 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: PR - 9/1/2004 Interval Top: 4402 ft. Interval Bottom: 5305 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 0.297 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/20/2001 | | Treatment Summary: | 4402-4516 FRAC W 400000 #20/40 + 3274 BBL 2%KCL 4862-5305 FRAC W 327000#20/40 + 2097 BBL 2%KCL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5048 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/7/2001 | Test Method: | FLOW | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 112 | | BBLS_OIL | 54 | | BTU_GAS | 1150 | | CALC_BBLS_H2O | 112 | | CALC_BBLS_OIL | 54 | | CALC_GOR | 17407 | | CALC_MCF_GAS | 940 | | CASING_PRESS | 730 | | GRAVITY_OIL | 41 | | MCF_GAS | 940 | | TUBING_PRESS | 240 |
| | Perforation Data: | | Interval Top: | 4402 ft. | # Of Holes: | 36 | | Interval Bottom: | 5305 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1761 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.830 |
| Average MCFE per Day | 4.823 |
| Federal Financial Assurance | i | |
|
|