Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07683
Well Classification: GW Status: PR - 1/1/2024
Well Name/No:PUCKETT #42-12D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2024
FacilityID:259003LocationID:334977
County:GARFIELD #045Location:SWNW 6 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6645 ft.
Basin:PICEANCE BASIN  
Planned Location:2426FNL  200 FWLLat/Long: 39.466478 / -108.158488Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.466530 / -108.158580Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2024             Measured TD: 7440 ft.    Vertical TD: 7010 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2024
Wellbore PermitDIRECTIONAL
Permit #:010108 Expiration Date:1/17/2002
Proposed Top PZ Location:Sec:12 Twp: 7S 97W Footage: 1980 FNL  660 FEL
Bottom Hole Location:Sec:12 Twp: 7S 97W Footage: 1980 FNL  660 FEL
Proposed Depth/Form:7770 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/2/2002
Spud Date:3/18/2001Spud Date Is:ACTUAL
Measured TD:7440 ft.Measured PB depth:7319 ft.
True Vertical TD:7010 ft.True Vertical PB depth:6889 ft.
Top PZ Location:Sec: Twp: Footage: 1999 FNL  663 FEL
Bottom Hole Location:Sec: Twp: Footage: 2006 FNL  647 FEL
Log Types:
Log Types:DENSITY,NEUTRON,INDUCTION,MICROLOG,GAMMA RAY
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 3089 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 977, Top: 0 ft., Bottom: 3089 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7319 ft., Weight: 11.8 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 4304 ft., Bottom: 7319 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2652 ft.NN
FORT UNION2992 ft.NN
WILLIAMS FORK4595 ft.NN
CAMEO6884 ft.NN
ROLLINS7345 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2024                  Interval Top: 6660 ft.    Interval Bottom: 7148 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/12/2002Choke Size:0.312 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:FLOWING
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/4/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 118
CASING_PRESS 600
MCF_GAS 1165
Perforation Data:
Interval Top:6660 ft.# Of Holes:20
Interval Bottom:7148 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)25798
GOR2149833
GOR DeterminationMCFE
Average BOE per Day12.225
Average MCFE per Day70.888

 Federal Financial Assurance  i 

 Tribal Well  i No