|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/1/2024 Measured TD: 7508 ft. Vertical TD: 7119 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 010094 | Expiration Date: | 1/15/2002 | | Proposed Top PZ Location: | Sec:6 Twp: 7S 96W | Footage: 1980 FSL 1980 FWL | | Bottom Hole Location: | Sec:6 Twp: 7S 96W | Footage: 1980 FSL 1980 FSL | | Proposed Depth/Form: | 7850 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-1 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 5/2/2002 | | Spud Date: | 3/14/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 7508 ft. | Measured PB depth: | 7483 ft. | | True Vertical TD: | 7119 ft. | True Vertical PB depth: | 7094 ft. | | Top PZ Location: | Sec: Twp: | Footage: 2046 FSL 2016 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 2026 FSL 2011 FWL | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: 0 ft., Depth: 61 ft., Weight: 84 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 61 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2967 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 977, Top: 0 ft., Bottom: 2967 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7483 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 4080 ft., Bottom: 7483 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK - CAMEO | | 6976 ft. | | |
Formation WFCM Formation Classification: GW Status: PR - 1/1/2024 Interval Top: 6266 ft. Interval Bottom: 7048 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 7/12/2002 | Choke Size: | 0.380 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/2/2002 | | Treatment Summary: | 5/2/02 BJ SERVICES FRACED WITH 1945 BBL OF 25# VIKING AND 168000# OF 20/40 AND 5900# OF 14/40 FLEX SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6976 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/13/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 1936 |
| | Perforation Data: | | Interval Top: | 6266 ft. | # Of Holes: | 44 | | Interval Bottom: | 7048 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 6 |
| Total Gas Produced (MCF) | 11787 |
| GOR | 1964500 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.585 |
| Average MCFE per Day | 32.399 |
| Federal Financial Assurance | i | |
|
|