Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07678
Well Classification: GW Status: PR - 1/1/2024
Well Name/No:PUCKETT #13-6D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2024
FacilityID:258990LocationID:334977
County:GARFIELD #045Location:SWNW 6 7S96W 6
Field:GRAND VALLEY - #31290Elevation:7800 ft.
Basin:PICEANCE BASIN  
Planned Location:2382FNL  224 FWLLat/Long: 39.466598 / -108.158398Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.466670 / -108.158530Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2024             Measured TD: 7135 ft.    Vertical TD: 7059 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2024
Wellbore PermitDIRECTIONAL
Permit #:010093 Expiration Date:1/15/2002
Proposed Top PZ Location:Sec:6 Twp: 7S 96W Footage: 1980 FSL  660 FWL
Bottom Hole Location:Sec:6 Twp: 7S 96W Footage: 1980 FSL  660 FWL
Proposed Depth/Form:7450 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/2/2002
Spud Date:6/6/2001Spud Date Is:ACTUAL
Measured TD:7135 ft.Measured PB depth:7098 ft.
True Vertical TD:7059 ft.True Vertical PB depth:7022 ft.
Top PZ Location:Sec: Twp: Footage: 1678 FSL  694 FWL
Bottom Hole Location:Sec: Twp: Footage: 1663 FSL  690 FWL
Log Types:
Log Types:DEN , GR, NEUTRON, MICROLOG
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 16 in., Top: , Depth: 42 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: , Bottom: 42 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 2719 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 977, Top: , Bottom: 2719 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7098 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 4077 ft., Bottom: 7098 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2599 ft.NN
FORT UNION2988 ft.NN
WILLIAMS FORK4242 ft.NN
CAMEO6565 ft.NN
ROLLINS7060 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2024                  Interval Top: 6088 ft.    Interval Bottom: 6859 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/4/2002Choke Size:0.313 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:PRODUCING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2002
Treatment Summary:5/23/02 B J SERVICES FRACED WITH 1973 BBL OF 25# VIKING AND 169500# OF 20/40 AND 8000 # OF 14/40 FLEX SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6646 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/25/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 25
MCF_GAS 874
Perforation Data:
Interval Top:6088 ft.# Of Holes:18
Interval Bottom:6859 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3
Total Gas Produced (MCF)14778
GOR4926000
GOR DeterminationMCFE
Average BOE per Day6.983
Average MCFE per Day40.503

 Federal Financial Assurance  i 

 Tribal Well  i No