Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07634
Well Classification: GW Status: PR - 6/1/2002
Well Name/No:ROLES #13-11R (N13)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2002
FacilityID:258297LocationID:334593
County:GARFIELD #045Location:SESW 13 7S93W 6
Field:MAMM CREEK - #52500Elevation:6338 ft.
Basin:PICEANCE BASIN  
Planned Location:748FSL  2251 FWLLat/Long: 39.440631 / -107.724934Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.440490 / -107.724790Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2002             Measured TD: 7082 ft.    Vertical TD: 6887 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2002
Wellbore Permit
Permit #:001173 Expiration Date:10/24/2001
Proposed Top PZ Location:Sec:13 Twp: 7S 93W Footage: 1822 FSL  2015 FWL
Bottom Hole Location:Sec:13 Twp: 7S 93W Footage: 1980 FSL  1980 FWL
Proposed Depth/Form:6950 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:HUNTER MESA UNI Unit Number:55972E
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/9/2000
Spud Date:9/14/2000Spud Date Is:ACTUAL
Measured TD:7082 ft.Measured PB depth:7042 ft.
True Vertical TD:6887 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1822 FSL  2015 FWL
Bottom Hole Location:Sec: Twp: Footage: 1980 FSL  1980 FWL
Log Types:CBL,TDTL/GR-CCL.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 725 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 725 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7082 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 3560 ft., Bottom: 7082 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH3340 ft.4112 ft.NN
OHIO CREEK4112 ft.4759 ft.NN
WILLIAMS FORK4759 ft.5280 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 6/1/2002                  Interval Top: 5701 ft.    Interval Bottom: 6962 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/9/2000
Treatment Summary:S1:6568-6962 ACID BREAKDOWN W/1500GAL 15%HCL ACID & 75RCM BALLSEALERS.FRAC W/1127BBS VISTAR 16 117900# 20/40 WHITE SAND. S2:6064-6448 ACID BREAKDOWN 1500GAL 15%HCL ACID & 75RCN BALLSEALERS.FRAC W/1647BBL VISTAR 16 W/139052#SAND. S3:5701- 5976 ACID BREAK
Tubing Size:2.375 in.Tubing Setting Depth:6552 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 8
CALC_BBLS_H2O 40
CALC_BBLS_OIL 8
CALC_GOR 123250
CALC_MCF_GAS 986
CASING_PRESS 700
MCF_GAS 986
TUBING_PRESS 500
Perforation Data:
Interval Top:5701 ft.# Of Holes:78
Interval Bottom:6962 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)31
Total Gas Produced (MCF)11714
GOR377870
GOR DeterminationMCFE
Average BOE per Day5.620
Average MCFE per Day32.609

 Federal Financial Assurance  i Y

 Tribal Well  i No