Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07633
Well Classification: GW Status: PR - 9/1/2004
Well Name/No:JACKSON #15-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2004
FacilityID:258296LocationID:335346
County:GARFIELD #045Location:SWSE 28 6S92W 6
Field:MAMM CREEK - #52500Elevation:5813 ft.
Basin:PICEANCE BASIN  
Planned Location:660FSL  1980 FELLat/Long: 39.492481 / -107.669233Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.492540 / -107.669073Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2004             Measured TD: 6293 ft.    Vertical TD: 6293 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2004
Wellbore PermitDIRECTIONAL
Permit #:001169 Expiration Date:10/24/2001
Bottom Hole Location:Sec:28 Twp: 6S 92W Footage: 327 FSL  1833 FEL
Proposed Depth/Form:6000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/27/2000
Spud Date:11/14/2000Spud Date Is:ACTUAL
Measured TD:6293 ft.Measured PB depth:6248 ft.
True Vertical TD:6293 ft.True Vertical PB depth:6248 ft.
Bottom Hole Location:Sec:28 Twp: 6S 92WFootage: 327 FSL  1833 FEL
Log Types:GR/SP/CNL/FDC/DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 752 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 720 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6293 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1100, Top: 550 ft., Bottom: 6293 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.NN
OHIO CREEK3054 ft.NN
UNKNOWN3634 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 9/1/2004                  Interval Top: 4722 ft.    Interval Bottom: 5916 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:THRU TUBING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/27/2000
Treatment Summary:5620-5916 - FRACED WITH 2593 BBLS 2% KCL + 364,000 # 20/40 SAND +422,300 SCF N2. 5042--5440 - FRACED WITH 2293 BBLS 2% KCL + 280,9400 # 20/40 SAND. 4722-4864 - FRACED WITH 644 BBLS 2 % KCL + 117,100 # 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:5766 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/2001Test Method:TO SALES LINE
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 10
BTU_GAS 1185
CALC_BBLS_H2O 5
CALC_BBLS_OIL 10
CALC_GOR 69000
CALC_MCF_GAS 690
CASING_PRESS 800
GRAVITY_OIL 45
MCF_GAS 690
TUBING_PRESS 560
Perforation Data:
Interval Top:4722 ft.# Of Holes:54
Interval Bottom:5916 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)4482
GOR194869
GOR DeterminationMCFE
Average BOE per Day2.179
Average MCFE per Day12.652

 Federal Financial Assurance  i 

 Tribal Well  i No