Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07631
Well Classification: GW Status: PR - 1/1/2024
Well Name/No:JOY #11-2 (B11W)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2024
FacilityID:258248LocationID:324128
County:GARFIELD #045Location:NWNE 11 7S93W 6
Field:MAMM CREEK - #52500Elevation:6254 ft.
Basin:PICEANCE BASIN  
Planned Location:1158FNL  1514 FELLat/Long: 39.464111 / -107.738535Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.464182 / -107.738413Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2024             Measured TD: 7912 ft.    Vertical TD: 7858 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2024
Wellbore PermitDIRECTIONAL
Permit #:001116 Expiration Date:10/15/2001
Proposed Top PZ Location:Sec:11 Twp: 7S 93W Footage: 780 FNL  1887 FEL
Bottom Hole Location:Sec:11 Twp: 7S 93W Footage: 660 FNL  1980 FEL
Proposed Depth/Form:7250 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEDERAL
Unit:HUNTER MESA UNI Unit Number:COC55972E
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/29/2001
Spud Date:2/14/2001Spud Date Is:ACTUAL
Measured TD:7912 ft.Measured PB depth:7837 ft.
True Vertical TD:7858 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 775 FNL  1873 FEL
Bottom Hole Location:Sec: Twp: Footage: 719 FNL  1942 FEL
Log Types:RST,CBL-GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 745 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 745 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7897 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 4724 ft., Bottom: 7897 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.4838 ft.NN
WILLIAMS FORK4838 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 1/1/2024                  Interval Top: 5930 ft.    Interval Bottom: 7760 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/29/2001
Treatment Summary:STAGE1:7594-7760',1384BBL VIKING 169100#20/40 WHITE SAND. STAGE2:7350-7534',1370BBL VIKING 25, 181,480# 20/40 WHITE SAND.STAGE3:6911-7190',2118 BBL VIKING 25 282,200# 20/40 WHITE SAND STAGE4:6565-6826' 1869 BBL VIKING 25, 260,820# 20/40 WHITE SAND(CONT)
Tubing Size:1 in.Tubing Setting Depth:7350 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/22/2001Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 8
BTU_GAS 1170
CALC_BBLS_H2O 18
CALC_BBLS_OIL 8
CALC_GOR 141250
CALC_MCF_GAS 1130
CASING_PRESS 1880
MCF_GAS 1130
TUBING_PRESS 1680
Perforation Data:
Interval Top:5930 ft.# Of Holes:242
Interval Bottom:7760 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)7071
GOR
GOR DeterminationMCFE
Average BOE per Day3.339
Average MCFE per Day19.386

 Federal Financial Assurance  i Y

 Tribal Well  i No