Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07602
Well Classification: GW Status: PR - 11/7/2002
Well Name/No:UNOCAL #GM 31-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/7/2002
FacilityID:257840LocationID:335364
County:GARFIELD #045Location:NWNE 33 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5395 ft.
Basin:PICEANCE BASIN  
Planned Location:704FNL  2124 FELLat/Long: 39.485788 / -108.111586Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.486015 / -108.111535Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/7/2002             Measured TD: 6660 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/7/2002
Wellbore Permit
Permit #:000840 Expiration Date:8/8/2001
Proposed Depth/Form:6600 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-32 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:11/4/2000
Spud Date:9/27/2000Spud Date Is:ACTUAL
Measured TD:6660 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:DIL / SDL-CNL-GR/CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 319 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: , Bottom: 319 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6329 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 970, Top: 2800 ft., Bottom: 6329 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION2072 ft.NN
MESAVERDE2072 ft.NN
CAMEO COAL5947 ft.NN
ROLLINS6439 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/7/2002                 Interval Top: 4658 ft.    Interval Bottom: 6232 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/7/2000Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:4658 ft.# Of Holes:66
Interval Bottom:6232 ft.Hole Size:

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 3/8/2001                  Interval Top: 4658 ft.    Interval Bottom: 6232 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/4/2000
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/7/2000Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 10
CALC_MCF_GAS 1182
CASING_PRESS 1643
TUBING_PRESS 1566
Perforation Data:
Interval Top:4658 ft.# Of Holes:66
Interval Bottom:6232 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)6
Total Gas Produced (MCF)4900
GOR816666
GOR DeterminationMCFE
Average BOE per Day2.335
Average MCFE per Day13.527

 Federal Financial Assurance  i 

 Tribal Well  i No