Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07598
Well Classification: GW Status: PR - 7/7/2000
Well Name/No:FEDERAL #GM 42-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/7/2000
FacilityID:257813LocationID:334735
County:GARFIELD #045Location:SENE 14 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5138 ft.
Basin:PICEANCE BASIN  
Planned Location:2380FNL  500 FELLat/Long: 39.438159 / -108.069725Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.438286 / -108.069832Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/7/2000             Measured TD: 5750 ft.    Vertical TD: 5744 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/7/2000
Wellbore PermitDIRECTIONAL
Permit #:000829 Expiration Date:8/6/2001
Proposed Top PZ Location:Sec:14 Twp: 7S 96W Footage: 2200 FNL  500 FEL
Bottom Hole Location:Sec:14 Twp: 7S 96W Footage: 2200 FNL  500 FEL
Proposed Depth/Form:5770 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: , Weight: 45 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:N/A
Spud Date:8/19/2000Spud Date Is:ACTUAL
Measured TD:5750 ft.Measured PB depth:
True Vertical TD:5744 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2200 FNL  500 FEL
Bottom Hole Location:Sec: Twp: Footage: 2200 FNL  500 FEL
Log Types:DUAL IND SPEC DENS DUAL SPAC NEUT
Log Types:DUAL IND SPEC DENS DUAL SPACED NEUT,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 308 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 308 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5747 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 4000 ft., Bottom: 5747 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1194 ft.NN
FORT UNION1410 ft.NN
MESAVERDE2809 ft.NN
CAMEO COAL5293 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/7/2000                  Interval Top: 4230 ft.    Interval Bottom: 5647 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/23/2000
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:5277 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/23/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
CALC_BBLS_H2O 5
CALC_MCF_GAS 1194
CASING_PRESS 1485
MCF_GAS 1194
TUBING_PRESS 1406
Perforation Data:
Interval Top:4230 ft.# Of Holes:69
Interval Bottom:5647 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)6262
GOR569272
GOR DeterminationMCFE
Average BOE per Day2.992
Average MCFE per Day17.336

 Federal Financial Assurance  i Y

 Tribal Well  i No