Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07598
Well Classification: GW Status: PR - 7/7/2000
Well Name/No:FEDERAL #GM 42-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/7/2000
FacilityID:257813LocationID:334735
County:GARFIELD #045Location:SENE 14 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5138 ft.
Basin:PICEANCE BASIN  
Planned Location:2380FNL  500 FELLat/Long: 39.438159 / -108.069725Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.438286 / -108.069832Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/7/2000             Measured TD: 5750 ft.    Vertical TD: 5744 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/7/2000
Wellbore PermitDIRECTIONAL
Permit #:000829 Expiration Date:8/6/2001
Proposed Top PZ Location:Sec:14 Twp: 7S 96W Footage: 2200 FNL  500 FEL
Bottom Hole Location:Sec:14 Twp: 7S 96W Footage: 2200 FNL  500 FEL
Proposed Depth/Form:5770 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: , Weight: 45 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:N/A
Spud Date:8/19/2000Spud Date Is:ACTUAL
Measured TD:5750 ft.Measured PB depth:
True Vertical TD:5744 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2200 FNL  500 FEL
Bottom Hole Location:Sec: Twp: Footage: 2200 FNL  500 FEL
Log Types:DUAL IND SPEC DENS DUAL SPAC NEUT
Log Types:DUAL IND SPEC DENS DUAL SPACED NEUT,CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 308 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 308 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5747 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 4000 ft., Bottom: 5747 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1194 ft.NN
FORT UNION1410 ft.NN
MESAVERDE2809 ft.NN
CAMEO COAL5293 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/7/2000                  Interval Top: 4230 ft.    Interval Bottom: 5647 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/23/2000
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:5277 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/23/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
CALC_BBLS_H2O 5
CALC_MCF_GAS 1194
CASING_PRESS 1485
MCF_GAS 1194
TUBING_PRESS 1406
Perforation Data:
Interval Top:4230 ft.# Of Holes:69
Interval Bottom:5647 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)6357
GOR529750
GOR DeterminationMCFE
Average BOE per Day3.041
Average MCFE per Day17.611

 Federal Financial Assurance  i Y

 Tribal Well  i No