|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/24/2004 Measured TD: Vertical TD: 6350 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/24/2004 | | Wellbore Permit | | | Permit #: | 000679 | Expiration Date: | 7/6/2001 | | Proposed Depth/Form: | 6400 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | GRASS MESA UNIT | Unit Number: | COC56608A | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: 9473, Drill Unit: U |
| | |
| Wellbore Completed | | Completion Date: | 9/16/2000 | | Spud Date: | 7/11/2000 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | 6350 ft. | True Vertical PB depth: | 6145 ft. | | Log Types: | CBL,TDTL/GR/CCL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 654 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 654 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6261 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 3870 ft., Bottom: 6261 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 2635 ft. | 3324 ft. | N | N | | OHIO CREEK | 3324 ft. | 4050 ft. | N | N | | WILLIAMS FORK | 4050 ft. | 4628 ft. | N | N |
Formation WMFK Formation Classification: GW Status: PR - 3/24/2004 Interval Top: 4862 ft. Interval Bottom: 6098 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2000 | | Treatment Summary: | 1)ACID BREAKDOWN W/1500 GAL 15% HCI ACID & 100 RCN BALL SEALERS 7/8" DIA FRAC W/886 BBL & 85948# 20/20 WHITE SAND. 2)ACID BREAKDOWN W/1500 GAL 15% HCI ACID. FRAC W/1674 BBL 17255# 20/40 WHITE SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5755 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/18/2000 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 32 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 47720 | | CALC_MCF_GAS | 1527 | | CASING_PRESS | 310 | | MCF_GAS | 1527 | | TUBING_PRESS | 590 |
| | Perforation Data: | | Interval Top: | 4862 ft. | # Of Holes: | 75 | | Interval Bottom: | 6098 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 44 |
| Total Gas Produced (MCF) | 11027 |
| GOR | 250613 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.327 |
| Average MCFE per Day | 30.905 |
| Federal Financial Assurance | i | Y |
|
|