Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07541
Well Classification: GW Status: PR - 12/17/2000
Well Name/No:GMR #4-9 (P33NW)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/17/2000
FacilityID:257354LocationID:334604
County:GARFIELD #045Location:SESE 33 6S93W 6
Field:MAMM CREEK - #52500Elevation:6798 ft.
Basin:PICEANCE BASIN  
Planned Location:655FSL  720 FELLat/Long: 39.477140 / -107.773186Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.477320 / -107.773230Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/17/2000             Measured TD: 8620 ft.    Vertical TD: 8364 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/17/2000
Wellbore Permit
Permit #:000519 Expiration Date:5/25/2001
Proposed Top PZ Location:Sec:4 Twp: 7S 94W Footage: 837 FNL  562 FEL
Bottom Hole Location:Sec:4 Twp: 7S 93W Footage: 1980 FSL  660 FEL
Proposed Depth/Form:8350 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:HUNTER MESA Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: 9473, Drill Unit: U

Wellbore Completed
Completion Date:12/14/2000
Spud Date:9/9/2000Spud Date Is:ACTUAL
Measured TD:8620 ft.Measured PB depth:8547 ft.
True Vertical TD:8364 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 837 FNL  562 FEL
Bottom Hole Location:Sec: Twp: Footage: 1980 FSL  660 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 820 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 820 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8620 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 5690 ft., Bottom: 8620 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK5465 ft.6235 ft.NN
WILLIAMS FORK6235 ft.6704 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 12/17/2000                Interval Top: 7294 ft.    Interval Bottom: 8448 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/14/2000
Treatment Summary:STAGE1: PERFS 8051-8448' ACID BREAKDOWN W/1500 GALS 15% HCL ACID W/75RCN BALL SEALERS, FRAC W/951 BBLS VISTAR 16&100,000#S 20/40 WHITE SAND.(73,130# IN FORMATION&15,000 IN PIPE, 11,870 ON GROUND). STAGE 2: PERFS 7294-7922' ACID BREAKDOWN W/1500 GALS 15% H
Tubing Size:2.375 in.Tubing Setting Depth:8040 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/17/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
CALC_BBLS_H2O 13
CALC_BBLS_OIL 0
CALC_MCF_GAS 401
CASING_PRESS 500
MCF_GAS 401
TUBING_PRESS 320
Perforation Data:
Interval Top:7294 ft.# Of Holes:51
Interval Bottom:8448 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)5033
GOR
GOR DeterminationMCFE
Average BOE per Day2.377
Average MCFE per Day13.783

 Federal Financial Assurance  i Y

 Tribal Well  i No