|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 3/1/2025 Measured TD: Vertical TD: 8300 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 3/1/2025 | | Wellbore Permit | | | Permit #: | 000516 | Expiration Date: | 5/25/2001 | | Proposed Depth/Form: | 8400 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | GRASS MESA | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: 9473, Drill Unit: U |
| | |
| Wellbore Completed | | Completion Date: | 12/17/2000 | | Spud Date: | 8/22/2000 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | 8260 ft. | | True Vertical TD: | 8300 ft. | True Vertical PB depth: | | | Log Types: | CBL, TDTL/GR-CCL, CN/LD, AI | | Log Types: | CBL,TDTL/GR-CCL,CN/LD,AI | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 831 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 385, Top: 0 ft., Bottom: 831 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8300 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 5020 ft., Bottom: 8300 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 4600 ft. | 5310 ft. | N | N | | OHIO CREEK | 5310 ft. | 6007 ft. | N | N | | WILLIAMS FORK | 6007 ft. | 6550 ft. | N | N |
Formation WMFK Formation Classification: GW Status: PR - 3/1/2025 Interval Top: 6988 ft. Interval Bottom: 7486 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 6/19/2005 | Choke Size: | 0.625 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2005 | | Treatment Summary: | STAGE 2 REFRAC WAS TREATED WITH A TOTAL OF 8220 BBLS OF SLICKWATER & 210,900# 20/40 SAND. NO NEW HOLES WERE PERFED. ENCANA JUST DID A REFRAC OF EXISITNG PERFS. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7145 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/19/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 1 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 11 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 152230 | | CALC_MCF_GAS | 198 | | CASING_PRESS | 43 | | MCF_GAS | 198 | | TUBING_PRESS | 50 |
| | Perforation Data: | | Interval Top: | 6988 ft. | # Of Holes: | 30 | | Interval Bottom: | 7486 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1518 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.720 |
| Average MCFE per Day | 4.153 |
| Federal Financial Assurance | i | |
|
|