|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/12/2003 Measured TD: 7986 ft. Vertical TD: 7940 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/12/2003 | | Wellbore Permit | | | Permit #: | 000143 | Expiration Date: | 2/17/2001 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 660 FNL 1950 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 660 FNL 1950 FEL | | Proposed Depth/Form: | 7930 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: 40, Drill Unit: NWNE |
| | |
| Wellbore Completed | | Completion Date: | 5/5/2000 | | Spud Date: | 4/14/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 7986 ft. | Measured PB depth: | 7941 ft. | | True Vertical TD: | 7940 ft. | True Vertical PB depth: | 7895 ft. | | Top PZ Location: | Sec: Twp: | Footage: 666 FNL 1991 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 670 FNL 1932 FEL | | Log Types: | DUAL IND, NEUT DENSITY. CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1060 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 1060 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7986 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1440, Top: 1000 ft., Bottom: 7986 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 4516 ft. | 7372 ft. | N | N | | COAL | 7372 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: PR - 12/12/2003 Interval Top: 6222 ft. Interval Bottom: 6370 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 10/25/2003 | Choke Size: | 12.000 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/20/2003 | | Treatment Summary: | STAGE 4R WAS TREATED WITH A TOTAL OF 4642 BBLS OF SLICKWATER & 175,000# 20/40 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7341 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/12/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 36 | | BBLS_OIL | 5 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 36 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 31553 | | CALC_MCF_GAS | 148 | | CASING_PRESS | 1200 | | MCF_GAS | 148 | | TUBING_PRESS | 900 |
| | Perforation Data: | | Interval Top: | 6222 ft. | # Of Holes: | 22 | | Interval Bottom: | 6370 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 40 |
| Total Gas Produced (MCF) | 13166 |
| GOR | 329150 |
| GOR Determination | MCFE |
| Average BOE per Day | 6.329 |
| Average MCFE per Day | 36.720 |
| Federal Financial Assurance | i | Y |
|
|