|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/4/2000 Measured TD: 5993 ft. Vertical TD: 5934 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/4/2000 | | Wellbore Permit | | | Permit #: | 000140 | Expiration Date: | 2/17/2001 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1961 FNL 661 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 1996 FNL 662 FEL | | Proposed Depth/Form: | 5920 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/24/2000 | | Spud Date: | 3/10/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 5993 ft. | Measured PB depth: | 5946 ft. | | True Vertical TD: | 5934 ft. | True Vertical PB depth: | 5887 ft. | | Top PZ Location: | Sec: Twp: | Footage: 1772 FNL 763 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 1769 FNL 713 FEL | | Log Types: | DUAL IND, NEUT DENS | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 896 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 896 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5993 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 950, Top: 890 ft., Bottom: 5993 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 2490 ft. | 5497 ft. | N | N | | COAL | 5497 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: PR - 2/4/2000 Interval Top: 4878 ft. Interval Bottom: 5344 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 1.125 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/24/2000 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5129 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/5/2000 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 7 | | BTU_GAS | 1130 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 7 | | CALC_MCF_GAS | 1105 | | CASING_PRESS | 1475 | | MCF_GAS | 1105 | | TUBING_PRESS | 1325 |
| | Perforation Data: | | Interval Top: | 4878 ft. | # Of Holes: | 20 | | Interval Bottom: | 5344 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 9084 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 4.287 |
| Average MCFE per Day | 24.885 |
| Federal Financial Assurance | i | Y |
|
|