Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07491
Well Classification: GW Status: PR - 9/1/2020
Well Name/No:PUCKETT #31-14D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:636800
Facility Status:PRStatus Date9/1/2020
FacilityID:256734LocationID:335383
County:GARFIELD #045Location:SESW 31 6S96W 6
Field:GRAND VALLEY - #31290Elevation:6215 ft.
Basin:PICEANCE BASIN  
Planned Location:600FSL  2393 FWLLat/Long: 39.474778 / -108.150718Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.474794 / -108.150781Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2020             Measured TD: 7096 ft.    Vertical TD: 6668 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2020
Wellbore Permit
Permit #:000128 Expiration Date:2/17/2001
Proposed Top PZ Location:Sec: Twp: Footage: 683 FSL  557 FWL
Bottom Hole Location:Sec: Twp: Footage: 632 FSL  516 FWL
Proposed Depth/Form:7750 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CMEO , Formation: CAMEO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 501-1 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/18/2000
Spud Date:2/22/2000Spud Date Is:ACTUAL
Measured TD:7096 ft.Measured PB depth:7096 ft.
True Vertical TD:6668 ft.True Vertical PB depth:6668 ft.
Top PZ Location:Sec: Twp: Footage: 683 FSL  557 FWL
Bottom Hole Location:Sec: Twp: Footage: 632 FSL  516 FWL
Log Types:DSI,CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1303 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 1303 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7205 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 3960 ft., Bottom: 7096 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT UNION2846 ft.4120 ft.NN
WILLIAMS FORK4120 ft.6621 ft.NN
CAMEO6621 ft.7096 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2020                  Interval Top: 5778 ft.    Interval Bottom: 6906 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/14/2000Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/18/2000
Treatment Summary:FRAC'D W/3306 BBL OF 16# VISTAR AND 102 BBL SLICK WATER 340050# OF 20/40 AND 7935# OF 14/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/22/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 48
CASING_PRESS 1050
MCF_GAS 979
Perforation Data:
Interval Top:5778 ft.# Of Holes:56
Interval Bottom:6906 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)11777
GOR
GOR DeterminationMCFE
Average BOE per Day5.568
Average MCFE per Day32.301

 Federal Financial Assurance  i 

 Tribal Well  i No