Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07483
Well Classification: GW Status: PR - 6/1/2021
Well Name/No:HMU FEDERAL #18-16(I18)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C43220
Facility Status:PRStatus Date6/1/2021
FacilityID:256692LocationID:334866
County:GARFIELD #045Location:NESE 18 7S92W 6
Field:MAMM CREEK - #52500Elevation:6157 ft.
Basin:PICEANCE BASIN  
Planned Location:2212FSL  898 FELLat/Long: 39.445091 / -107.702594Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.445220 / -107.702580Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2021             Measured TD: 6182 ft.    Vertical TD: 5885 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2021
Wellbore Permit
Permit #:000088 Expiration Date:2/7/2001
Proposed Top PZ Location:Sec:18 Twp: 7S 92W Footage: 701 FEL  927 FSL
Bottom Hole Location:Sec:18 Twp: 7S 92W Footage: 659 FEL  660 FSL
Proposed Depth/Form:6050 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:FEE
Unit:HUNTER MESA UNI Unit Number:55972E
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: 25000, Drill Unit:

Wellbore Completed
Completion Date:9/7/2000
Spud Date:5/28/2000Spud Date Is:ACTUAL
Measured TD:6182 ft.Measured PB depth:6135 ft.
True Vertical TD:5885 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 927 FSL  701 FEL
Bottom Hole Location:Sec: Twp: Footage: 660 FSL  691 FEL
Log Types:CBL,CN/LD/GR,AI/GR.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 740 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 710 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6182 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 772, Top: 3100 ft., Bottom: 6182 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2483 ft.3238 ft.NN
OHIO CREEK3238 ft.4000 ft.NN
WILLIAMS FORK4000 ft.4550 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 6/1/2021                  Interval Top: 4782 ft.    Interval Bottom: 5923 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2000
Treatment Summary:STAGE 1: PERFS 5768'-5923' ACID BREAKDOWN W/1000 GALS 15% HCI ACID&100 BIO BALL SEALERS. FRAC W/1287 BBLS VISTAR 16&115,301# 20/40 WHITE SAND. STAGE 2: PERFS 5142-5521 ACID BREAKDOWN W/1000 GALS 15% HCI ACID&100 BIO BALL SEALERS. FRAC W/1532 BBLS VISTAR
Tubing Size:2.375 in.Tubing Setting Depth:5746 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/20/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 5
CALC_BBLS_H2O 12
CALC_BBLS_OIL 5
CALC_GOR 10500
CALC_MCF_GAS 525
CASING_PRESS 480
MCF_GAS 525
TUBING_PRESS 300
Perforation Data:
Interval Top:4782 ft.# Of Holes:75
Interval Bottom:5923 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)8816
GOR678153
GOR DeterminationMCFE
Average BOE per Day4.201
Average MCFE per Day24.353

 Federal Financial Assurance  i Y

 Tribal Well  i No