Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07467
Well Classification: GW Status: PR - 12/22/1999
Well Name/No:BATTLEMENT MESA #PA 41-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/22/1999
FacilityID:256513LocationID:334964
County:GARFIELD #045Location:NENE 9 7S95W 6
Field:PARACHUTE - #67350Elevation:5853 ft.
Basin:PICEANCE BASIN  
Planned Location:667FNL  854 FELLat/Long: 39.457749 / -107.996623Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.457540 / -107.996456Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/22/1999             Measured TD: 125 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/22/1999
Wellbore Permit
Permit #:991004 Expiration Date:12/21/2000
Proposed Depth/Form:7200 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-12 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:7/19/2000
Spud Date:4/13/2000Spud Date Is:ACTUAL
Measured TD:125 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON
Log Types:DUAL IND SPEC DENS DUAL SPACED NEUTRON
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 916 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 460, Top: , Bottom: 916 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7111 ft., Weight: 11.6# , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 3410 ft., Bottom: 7110 ft., Determination Method:
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 93 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7110 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 3410 ft., Bottom: 7110 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
UNKNOWN1861 ft.NN
FORT UNION2401 ft.NN
WASATCH G2403 ft.NN
MESAVERDE3960 ft.NN
CAMEO COAL6496 ft.NN
ROLLINS7037 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/1/2012                 Interval Top: 4990 ft.    Interval Bottom: 6910 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/19/2000
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:6214 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/27/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 0
CALC_BBLS_H2O 10
CALC_BBLS_OIL 0
CALC_MCF_GAS 196
MCF_GAS 196
TUBING_PRESS 1463
Perforation Data:
Interval Top:4990 ft.# Of Holes:62
Interval Bottom:6910 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)3
Total Gas Produced (MCF)4004
GOR1334666
GOR DeterminationMCFE
Average BOE per Day1.903
Average MCFE per Day11.027

 Federal Financial Assurance  i 

 Tribal Well  i No