Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07452
Well Classification: GW Status: PR - 12/1/1999
Well Name/No:BJM #31-15 (J31)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/1999
FacilityID:256508LocationID:333111
County:GARFIELD #045Location:NWSE 31 6S92W 6
Field:MAMM CREEK - #52500Elevation:5925 ft.
Basin:PICEANCE BASIN  
Planned Location:1921FSL  2072 FELLat/Long: 39.481141 / -107.706894Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.481240 / -107.706920Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/1999             Measured TD: 6390 ft.    Vertical TD: 6159 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/1999
Wellbore Permit
Permit #:990927 Expiration Date:11/30/2000
Proposed Depth/Form:6473 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:GRASS MESA UNIT Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/4/2000
Spud Date:12/18/1999Spud Date Is:ACTUAL
Measured TD:6390 ft.Measured PB depth:6318 ft.
True Vertical TD:6159 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 842 FSL  1965 FEL
Bottom Hole Location:Sec: Twp: Footage: 661 FSL  1865 FEL
Log Types:CBL,LD/CN/GR,DI
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 731 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 731 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6390 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 925, Top: 3550 ft., Bottom: 6390 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2553 ft.3322 ft.NN
OHIO CREEK3322 ft.4068 ft.NN
WILLIAMS FORK4068 ft.4665 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 12/1/1999                 Interval Top: 5020 ft.    Interval Bottom: 6174 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/4/2000
Treatment Summary:STAGE 1:5820-6174 FRAC W/1367 BBLS VISTAR 16 & 131468# 20/40 WHITE SAND & 7500# 14/40 FLEX SAND. STATE 2:5352-5750 FRAC W/1854 BBLS VISTAR 16 & 184868# 20/40 WHITE SAND & 7633 14/40 FLEX SAND. STAGE 3:5020-5250 FRAC W/693 BBL VISTAR 16 & 86186# 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:5805 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/9/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 12
CALC_BBLS_H2O 0
CALC_BBLS_OIL 12
CALC_MCF_GAS 431
CASING_PRESS 450
MCF_GAS 431
TUBING_PRESS 280
Perforation Data:
Interval Top:5020 ft.# Of Holes:78
Interval Bottom:6174 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)7
Total Gas Produced (MCF)8786
GOR1255142
GOR DeterminationMCFE
Average BOE per Day4.167
Average MCFE per Day24.169

 Federal Financial Assurance  i Y

 Tribal Well  i No