Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07451
Well Classification: GW Status: PR - 6/6/2000
Well Name/No:COUEY #31-16 (J31)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/6/2000
FacilityID:256412LocationID:333111
County:GARFIELD #045Location:NWSE 31 6S92W 6
Field:MAMM CREEK - #52500Elevation:5925 ft.
Basin:PICEANCE BASIN  
Planned Location:1941FSL  2072 FELLat/Long: 39.481201 / -107.706904Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.481300 / -107.706920Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/6/2000             Measured TD: 6710 ft.    Vertical TD: 6316 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/6/2000
Wellbore Permit
Permit #:990926 Expiration Date:11/29/2000
Proposed Depth/Form:6690 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:GRASS MESA UNIT Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/30/2000
Spud Date:1/1/2000Spud Date Is:ACTUAL
Measured TD:6710 ft.Measured PB depth:6626 ft.
True Vertical TD:6316 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 866 FSL  847 FEL
Bottom Hole Location:Sec: Twp: Footage: 660 FSL  660 FEL
Log Types:CBL,AI,GR,CN,LD,GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 713 ft., Weight: 247 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 713 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6708 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 825, Top: 3000 ft., Bottom: 6708 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2589 ft.3388 ft.NN
OHIO CREEK3388 ft.4110 ft.NN
WILLIAMS FORK4110 ft.4746 ft.NN
UNKNOWN4746 ft.4966 ft.NN
COAL6451 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 6/6/2000                  Interval Top: 5056 ft.    Interval Bottom: 6254 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/30/2000
Treatment Summary:STAGE 1:5980-6254 FRAC W/1518 BBLS VISTAR 16 & 151512#2 20/40 WHITE SAND & 7500# FLEX SAND.STATE 2: 5485-5783 FRAC W/1295 BBL VISTAR 16 W/123962# 20/40 WHITE SAND & 7600# 14/40 FLEX SAND. STAGE 3: 5056-5349 FRAC W/1256 BBL VISTAR 16 W/117072 20/40 WH SD.
Tubing Size:2.375 in.Tubing Setting Depth:5950 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/3/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 13
CALC_BBLS_H2O 0
CALC_BBLS_OIL 13
CALC_GOR 31923
CALC_MCF_GAS 415
CASING_PRESS 330
MCF_GAS 415
TUBING_PRESS 265
Perforation Data:
Interval Top:5056 ft.# Of Holes:78
Interval Bottom:6254 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)7307
GOR
GOR DeterminationMCFE
Average BOE per Day3.452
Average MCFE per Day20.015

 Federal Financial Assurance  i Y

 Tribal Well  i No