Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07440
Well Classification: GW Status: PR - 10/27/1999
Well Name/No:BOSLEY #GM 34-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/27/1999
FacilityID:256312LocationID:334753
County:GARFIELD #045Location:SWSE 14 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5168 ft.
Basin:PICEANCE BASIN  
Planned Location:876FSL  1912 FELLat/Long: 39.432609 / -108.074725Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.432918 / -108.074884Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/27/1999             Measured TD: 5656 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/27/1999
Wellbore Permit
Permit #:990805 Expiration Date:10/26/2000
Proposed Depth/Form:5735 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: 40, Drill Unit: SWSE

Wellbore Completed
Completion Date:9/10/2000
Spud Date:9/2/2000Spud Date Is:ACTUAL
Measured TD:5656 ft.Measured PB depth:5575 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 7S 96WFootage: 846 FSL  1938 FEL
Bottom Hole Location:Sec:14 Twp: 7S 96WFootage: 764 FSL  1972 FEL
Log Types:DUAL IND SPEC DENS DUAL SPA NEUT.
Log Types:CBL/RPM/MUD; COGCC confirmed of having the OH logs;
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 328 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 328 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5645 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 3620 ft., Bottom: 5645 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 3860 ft., Depth: 3860 ft., Bottom: 4100 ft., Sacks: 200, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 3768 ft., Depth: 3850 ft., Bottom: 4193 ft., Sacks: 50, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 4315 ft., Depth: 4434 ft., Bottom: 4650 ft., Sacks: 300, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WASATCH G1067 ft.
WASATCH1071 ft.NN
FORT UNION1351 ft.NN
MESAVERDE2650 ft.
WILLIAMS FORK2650 ft.
CAMEO5114 ft.
CAMEO COAL5114 ft.NN
ROLLINS5578 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/27/1999                Interval Top: 4434 ft.    Interval Bottom: 5430 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/3/2000
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:5001 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/13/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
CALC_BBLS_H2O 20
CALC_MCF_GAS 1343
CASING_PRESS 1537
MCF_GAS 1343
TUBING_PRESS 1560
Perforation Data:
Interval Top:4434 ft.# Of Holes:44
Interval Bottom:5430 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)2
Total Gas Produced (MCF)4008
GOR2004000
GOR DeterminationMCFE
Average BOE per Day1.901
Average MCFE per Day11.011

 Federal Financial Assurance  i 

 Tribal Well  i No