|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/23/1999 Measured TD: 6618 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/23/1999 | | Wellbore Permit | | | Permit #: | 990566 | Expiration Date: | 8/15/2000 | | Proposed Depth/Form: | 6650 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 440-16 , Unit Acreage: 320, Drill Unit: W2 | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6650 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 12/12/1999 | | Spud Date: | 10/13/1999 | Spud Date Is: | ACTUAL | | Measured TD: | 6618 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL IND SPEC DENS DUAL SPACED NEUTRON | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 726 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 335, Top: 0 ft., Bottom: 726 ft., Determination Method: | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6610 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1375, Top: 700 ft., Bottom: 6610 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1407 ft. | | N | N | | MESAVERDE | 3400 ft. | | N | N | | CAMEO COAL | 6010 ft. | | N | N | | ROLLINS | 6545 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 5/22/2000 Interval Top: 4673 ft. Interval Bottom: 6277 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/12/1999 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/12/1999 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5915 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/15/1999 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1063 | | CASING_PRESS | 1606 | | MCF_GAS | 1063 | | TUBING_PRESS | 1561 |
| | Perforation Data: | | Interval Top: | 4673 ft. | # Of Holes: | 66 | | Interval Bottom: | 6277 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 11 |
| Total Gas Produced (MCF) | 8218 |
| GOR | 747090 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.908 |
| Average MCFE per Day | 22.703 |
| Federal Financial Assurance | i | |
|
|