|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/2/2001 Measured TD: 6562 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/2/2001 | | Wellbore Permit | | | Permit #: | 990518 | Expiration Date: | 7/22/2000 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEDERAL | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 510-1 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 8/16/1999 | Spud Date Is: | ACTUAL | | Measured TD: | 6562 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DISDDSN | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 305 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 0 ft., Bottom: 305 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6553 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 845, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1810 ft. | | N | N | | MESAVERDE | 3537 ft. | | N | N | | CAMEO COAL | 5985 ft. | | N | N | | ROLLINS | 6472 ft. | | N | N |
Formation CMEO Formation Classification: GW Status: CM - 8/2/2001| Completed Information for Formation CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEO. |
| | No Perforation Data was found for formation CMEO. |
|
Formation WFCM Formation Classification: GW Status: PR - 8/2/2001| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/11/2000 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6109 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/11/2000 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1389 | | MCF_GAS | 1389 | | TUBING_PRESS | 1364 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
Formation WMFK Formation Classification: GW Status: CM - 8/2/2001| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | No Perforation Data was found for formation WMFK. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 12 |
| Total Gas Produced (MCF) | 10158 |
| GOR | 846500 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.831 |
| Average MCFE per Day | 28.034 |
| Federal Financial Assurance | i | Y |
|
|