Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-07408
Well Classification: GW Status: PR - 5/8/2000
Well Name/No:BENZEL #1-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/8/2000
FacilityID:199993LocationID:334801
County:GARFIELD #045Location:NESE 1 7S93W 6
Field:MAMM CREEK - #52500Elevation:6054 ft.
Basin:PICEANCE BASIN  
Planned Location:1980FSL  660 FELLat/Long: 39.473311 / -107.716854Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.473310 / -107.716930Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/8/2000             Measured TD:     Vertical TD: 6596 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/8/2000
Wellbore Permit
Permit #:990516 Expiration Date:7/22/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: 52678, Drill Unit: U

Wellbore Completed
Completion Date:3/11/2000
Spud Date:11/23/1999Spud Date Is:ACTUAL
Measured TD:Measured PB depth:
True Vertical TD:6596 ft.True Vertical PB depth:6517 ft.
Log Types:CBL, CN/LD/GR, AI/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 732 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 732 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6593 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 925, Top: 4697 ft., Bottom: 6593 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2805 ft.3480 ft.NN
OHIO CREEK3490 ft.4168 ft.NN
WILLIAMS FORK4168 ft.4749 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 5/8/2000                  Interval Top: 5067 ft.    Interval Bottom: 6478 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/11/2000
Treatment Summary:STAGE 1:6038-6478 FRAC W/1147 BBL VISTAR 16 W/19733# 20/40 WHITE SD.STAGE 2: 5405-5770 FRAC W/2210 BBL VISTAR 16 W/216078# 20/40 WHITE SD&7500# 14/40 FLEX SD.STATE 3:5067-5281 FRAC W/1215 BBL VISTAR 16 W/130000# 20/40 WHITE SD & 7673# 14/40 FLEX SD.
Tubing Size:2.375 in.Tubing Setting Depth:6036 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/4/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 5
CALC_BBLS_H2O 5
CALC_BBLS_OIL 5
CALC_GOR 180200
CALC_MCF_GAS 901
CASING_PRESS 565
MCF_GAS 901
TUBING_PRESS 470
Perforation Data:
Interval Top:5067 ft.# Of Holes:74
Interval Bottom:6478 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)10
Total Gas Produced (MCF)8933
GOR893300
GOR DeterminationMCFE
Average BOE per Day4.244
Average MCFE per Day24.642

 Federal Financial Assurance  i Y

 Tribal Well  i No