|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/15/2003 Measured TD: 6350 ft. Vertical TD: 5998 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/15/2003 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 990384 | Expiration Date: | 6/7/2000 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | |
| | |
| Wellbore Completed | | Completion Date: | 7/18/1999 | | Spud Date: | 7/1/1999 | Spud Date Is: | ACTUAL | | Measured TD: | 6350 ft. | Measured PB depth: | 6313 ft. | | True Vertical TD: | 5998 ft. | True Vertical PB depth: | 5961 ft. | | Top PZ Location: | Sec: Twp: | Footage: 1939 FNL 2146 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 2072 FNL 1911 FEL | | Log Types: | DUAL INDUCTION; NEUTRON DENSITY | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1576 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 515, Top: 0 ft., Bottom: 1576 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6350 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1000, Top: 200 ft., Bottom: 6350 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 2800 ft. | 5950 ft. | N | N | | CAMEO | 5950 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: PR - 2/15/2003 Interval Top: 4338 ft. Interval Bottom: 6304 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 1.125 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/18/1999 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6202 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/1/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | BTU_GAS | 1130 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1344 | | CASING_PRESS | 850 | | MCF_GAS | 1344 | | TUBING_PRESS | 675 |
| | Perforation Data: | | Interval Top: | 4338 ft. | # Of Holes: | 70 | | Interval Bottom: | 6304 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 5 |
| Total Gas Produced (MCF) | 10232 |
| GOR | 2046400 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.856 |
| Average MCFE per Day | 28.135 |
| Federal Financial Assurance | i | Y |
|
|